Consider the money-saving flexibility strategy of putting in an over-capacity utility and air ducting spine with capped-off stub connections for horizontal distribution, but don’t spend the money to run the connectors until needed.
- From Tradeline’s Science Buildings Canada 2006 Conference
What is the standard flexibility investment one should make in science buildings?
Learn more about design criteria for laboratory flexibility.

Printer Friendly Version
Send to a Friend

