![]() |
![]() |
Over-Capacity Utilities and HVACA flexibility strategy. Published July 2006
A money-saving idea for future growth.
Consider the money-saving flexibility strategy of putting in an over-capacity utility and air ducting spine with capped-off stub connections for horizontal distribution, but don’t spend the money to run the connectors until needed. - From Tradeline’s Science Buildings Canada 2006 Conference What is the standard flexibility investment one should make in science buildings? Learn more about design criteria for laboratory flexibility. |
Circulate to:
[ ] [ ] [ ] Notes: |
Copyright 2008 Tradeline Inc. All Rights Reserved ISSN: 1096-4894 | |