Search: Advanced
TradelineInc.com
Conferences News Planning Jobs About Store Accounts
 
 Tradeline Blog
RSSXML
Tradeline Blog

The Tradeline BLOG is an online exchange of quick bits of breaking information, intelligent “briefs”, promising technologies, emerging trends, HOT concepts “overheard” at Tradeline conferences, and some rare, practical stats that will help you keep tuned to the capital projects and facility management profession.

Do you have something to add? Please email us at blog@tradelineinc.com


Search This Section For:    

BLOG Activity from April 2008

Modular Biocontainment Labs

An efficient solution.
Public Health labs are going to be tasked to develop facilities for testing unknown biological, chemical, and radiological samples. Modular lab units provide a straightforward programmatic, technology, and financial way to meet this requirement. - From Tr...
 4.30.08



Regulatory Oversight for Biocontainment Facilities

Guidelines and trends.
Do not take the BMBL as a design document. It establishes the goals, not how to get there. Make sure to document your rationales for system decisions including questions that were asked, the discussed consequences of decisions, and control issues so that ...
 4.29.08



Risk and Threat Assessment for Biocontainment Facilities

A vital component of up-front planning.
A detailed risk and threat assessment is a critical part of the up-front facility planning process. The outcome of the risk and threat assessment can significantly drive up project costs, so perform such an assessment early to learn what you are up agains...
 4.28.08



How Much BSL-3 Space Do You Need?

Isolators and cubicles can provide cost-effective containment.
One very appropriate value engineering question to ask is whether or not all the BSL-3 space being asked for is necessary. A 10% reduction in BSL-3 space can free up a lot of dollars for other project features. By reducing the amount of biocontained vivar...
 4.27.08



Biocontainment Project Management

The necessity of staff and stakeholder input.
To make sure you are planning the right facility, get all stakeholders to sign off on a design-intent document and pass that document along at each project stage -- all the way to the user at the end. If you don’t have your occupational health and s...
 4.26.08



Condition-Based Maintenance for Biocontainment Facilities

A strategy for budget management.
Condition-based maintenance (CBM) methods and technology can greatly reduce maintenance budgets for biocontainment facilities, animal facilities, and other high-tech spaces. Properly run CBM programs may also obviate the need for costly shutdowns, testing...
 4.25.08



Biocontainment Commissioning

Tips for success.
For biocontainment commissioning, simulate your biggest potential spill or release event to make sure your biggest incident won’t be a disaster. For BSL2 and above, it is recommended that facilities be re-commissioned every year. If you have factory...
 4.24.08



Biosafety and Emergency Management

Integration is key.
Emergency management needs to be an integrated system. Identify it as a functional requirement. Also, be aware that the biosafety official responsible for facility operations may not be the right person to manage safety outside or adjacent to your biocont...
 4.23.08



Effluent Decontamination

The benefits of a steam coil heating system.
For effluent decontamination, steam coil heating systems experience less corrosion and mechanical failure. The consequences of a failure of an effluent decontamination systems can be very serious, so effluent decon systems should be designed with a 3X saf...
 4.22.08



Peer Reviews for Biocontainment Planning

Sharing practices creates operational excellence.
Develop a peer review process involving outside organizations that have biocontainment operations to make sure you’ve thought of everything, to discover efficient, better ways to do things, and to do a SWIFT (Structured What-If Technique) analysis. ...
 4.21.08



Lean Management and Energy Savings

Optimize equipment performance first.
The average commercial building should be able to easily reduce energy consumption by 30%. Don’t charge off on renewable energy initiatives before you first optimize your energy usage. You will save big on energy costs without the investment of adde...
 4.15.08



Benchmarking or Best Practices?

A shift in focus.
Instead of spending a lot of time benchmarking, spend your time and money collecting and implementing best practices. A possible downside to using benchmarking to assure yourself that your operation is OK is that that may prevent you from looking for area...
 4.13.08



Spend and Streamlining

Budget strategies for lean processes.
To find processes that are in need of streamlining, train the people who are doing the spend to build accurate, detailed budgets from the ground (zero) up. Another strategy is to do departmental and functional budget variance reviews in a group setting. T...
 4.12.08



Maintenance Management

Lean strategies for maintenance planning.
The opinion of maintenance management experts is that unnecessary preventative maintenance can actually cause maintenance problems. “If it isn’t broken, don’t fix it,” has become a legitimate lean management concept. Preventative m...
 4.11.08



Simplifying Capital Project Management

Pfizer's innovative single-form methodology.
Flying in the face of processes that employ complex software systems to streamline the management of large numbers of small and medium-sized capital projects, Pfizer has streamlined this process and virtually eliminated legal disputes with a simple paper-...
 4.10.08



The Integrated Design and Construction Model

Create integration with team project delivery contracts.
The newly emerging innovation in capital project delivery is having all the project parties (owner, architect, CM, contractor) sign a single integrated project delivery agreement or contract and share in the risk and incentive awards. To get (buy) a contr...
 4.9.08



Lean Capital Project Delivery

Putting dollar values on project outcomes.
The next step in lean thinking about capital projects will involve putting dollar values on capital project outcomes and making output value part of the Total Cost of Ownership decision-making process. The leaders for change in the area of capital project...
 4.8.08



The Capital Projects Complexity Scorecard

Metrics for decision making.
Use Genentech’s capital-project complexity scorecard to help a diverse core project team to understand and make decisions on project features and document a clear metric on the goal of the project. - From Tradeline’s Lean Management Processes...
 4.7.08



All BLOG Items

2008: Apr Mar Feb Jan
2007: Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb
2006: Nov Oct Sep Jul May Apr Mar Jan
2005: Dec Nov Sep Aug May Apr Mar
2004: Dec Nov Aug Apr
 Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!