Part I of this series discussed the first five of 10 design strategies geared toward enhancing operating efficiency and lowering energy costs. The strategies include focusing on programming, planning a rational layout, zoning appropriately, capitalizing on climatic forces, and creating the best structure for optimum daylighting. Part II examines the remaining design strategies and how they can be used to further enhance energy efficiency. The strategies were created by Paul Mathew, a staff scientist at Lawrence Berkeley National Laboratory (LBNL) in Berkeley, Calif., and Joe Collins, a partner at Zimmer Gunsul Frasca Architects in Portland, Ore.
Scrutinizing Air Changes
It is important to analyze the air changes and question the requirements and motivation behind these changes. Ventilation has a huge impact on overall operating costs not due just to the energy required to move the air, but also due to the energy required to heat and cool the air, particularly in extreme climates. The ventilation rates are often overestimated, so do not assume the air change rate is always driven by thermal loads. Additional changes do not necessarily equate to increased safety.
“Base optimum minimum ventilation requirements on user needs, health and safety protection, and energy consumption,” says Mathew. “The environmental health and safety officers usually set the rates, so designers need to work with them to optimize the rates. Consider design options, including exhaust alternatives, computational fluid dynamics (CFD) modeling, a panic switch for emergency airflow in case a spill occurs, cascading air use from clean areas to dirty areas, and occupancy sensors or a schedule-driven approach to change the rate when the space is not occupied.”
By performing CFD modeling of indoor airflows, designers can study airflow patterns and optimize the position of supply diffusers, return grilles, and fume hood locations relative to work surfaces and, thereby, improve the effectiveness of the airflow.
The ventilation rate seems to differ among research facilities and correlates with a corresponding difference in energy usage. Owners, architects, and engineers should inquire about what the proper rate should be in order to achieve maximum safety and savings.
Hutchinson Hall at the University of Rochester is an example of a building that had 10 air changes per hour, which represents an original standard set at least four decades ago. The environmental safety and health officer was asked why the rate was set at 10 and whether the potential hazards were reviewed. After reviewing the rate and its subsequent ramifications, the officer defined various hazard levels for different types of laboratories. This approach is called control banding. In each one, there was an occupied setting, as well as an unoccupied setting for the air change rate.
The issue of fume hoods being massive beasts of energy consumption must be considered, as well. A single fume hood consumes as much energy as three average homes, while a lab with 100 hoods utilizes as much energy as a small neighborhood. The LBNL provides an online tool at http://fumehoodcalculator.lbl.gov that enables users to compare fume hoods. Information about the type of hood, the price of electricity and gas, as well as the climate zone, can be entered into the system and the calculator will make comparisons between fume hoods. The calculator can be used to test the energy and cost impacts of improving component efficiencies and comparing options.
“Everything owners and programmers can do to reduce the number and the size of fume hoods is the best way to improve energy efficiency,” says Mathew. “Make sure you allow for easy additions and removals to alleviate concerns from faculty who think if it is not done now, it will never be installed. Consider variable air volume (VAV), two-speed fume hoods, the new generation of high-performance hoods that use a different airflow pattern and provide excellent containment with much lower volumes.”
Reduce the Pressure Drop
Approximately 50 percent of the total heating, ventilation, and air conditioning energy in a lab is related to fans and the electricity used to operate them. There are several ways to reduce that energy usage with the most logical being to improve the efficiency of the fans by ensuring the motors are in top working order. Total airflow can also be reduced through the VAV supply.
“An often overlooked strategy is to reduce system pressure drop throughout the entire ventilation system on both the supply and exhaust sides,” says Mathew. “Low-pressure drop design strategies can be used across the entire air distribution network. This low-pressure drop can result in 75 percent energy savings for fan loads, smaller fans used, longer filter life with less maintenance, and a more quiet operation.”
Reducing the total pressure drop through a ventilation system can be achieved by increasing the area of cooling and heating coils, resulting in the fans requiring less energy to push the air through the coils. Another way to reduce the drop is to use radial ducts instead of square ducts.
A major complaint architects hear from mechanical engineers is that they do not provide them with enough shaft space and ceiling plenum space. Therefore, allowing for larger ducts requires good upfront architectural integration to provide larger spaces.
At the University of California, Davis Tahoe Center for Environmental Sciences, engineers looked at the base case of the air handler, which was 2.2 inches of water gauge (w.g.) and dropped it to 0.68 w.g. The duct work was kept as straight and short as possible with large ducts. As a result of including these strategies, the engineers achieved a pressure drop that resulted in decreased energy usage.
Get Real with Plug Loads
Plug loads are basically the heat loads that result from any lab equipment that requires electricity and generates heat. HVAC systems are often oversized out of fear that a facility might not be able to meet over-estimated plug loads in the future. As a result, chillers and air handlers are often oversized and this leads to unnecessary expense and wasted operating cost in the long term.
Mechanical equipment should be right sized to save capital and operating costs. Study actual loads at comparable facilities to fully understand the real load, using improved estimates of heat gain from plug loads.
“Find out what the plug loads are at a comparable lab and then start your sizing based on that rather than an arbitrarily high number,” suggests Mathew. “You need to design for high part-load efficiency because labs aren’t always going to operate at peak loads. One of the ways you can do this is by using a modular approach.”
For example, two large boilers at the LBNL were replaced with 11 smaller, modular boilers. Each boiler kicks on as needed as the load ramps up. No more than seven of the boilers have operated simultaneously, leaving four completely redundant and demonstrating how oversizing occurs.
UC Davis is concerned about plug loads and is using right-sizing, in part, because of tight construction budgets and the need to minimize the impact of large mechanical equipment. In order to accomplish these objectives, the University began sizing to a 15-minute average peak rather than an instantaneous peak. Electrical systems must be sized accordingly, but mechanical systems should be sized for a lower quantity.
Right sizing is also being used at the Molecular Foundry Laboratory at the Berkeley Lab. The air handlers and electrical generators were downsized, resulting in a multi-million dollar initial cost savings. Some of the money saved was applied toward additional green features that qualify the facility for a Silver-level LEED certification.
Just Say No to Reheat
Avoid systems that require simultaneous heating and cooling. High-load areas require lower supply air temperature, so reheat occurs in other spaces. Simultaneous heating and cooling is problematic in labs where variations of internal loads can be enormous. A single zone requiring cooling can create artificial heating and cooling loads throughout a building.
“There are systems that can be designed to avoid reheat and simultaneous heating and cooling. They involve decoupling of thermal conditioning from the supply of ventilation air,” says Mathew. “For example, tempered air could be supplied to each lab space and then within each lab space fan coils can be used to take care of the heating and cooling loads in that lab space, so it is localized thermal conditioning with central ventilation supply.”
Haverford College in Philadelphia uses two heat wheels to provide temperature-neutral air to the lab spaces. The heat wheel system requires the supply and exhaust points to be located in close proximity to each other, resulting in larger shafts. Within each space, fan coils were used to provide the local heating and cooling. The setup completely eliminates reheat in the building.
Another scheme for decoupling and ventilation using passive chilled beams in lab spaces is being considered in the design of the Li Ka-Shing Center, $150-million health science building that will be constructed at the University of California, Berkeley beginning in 2008.
“The cold beam has chilled water running through it and with a process of natural convection, the warm air rises, comes into contact with the cold beam, cools, and then drops,” explains Mathew. “It is a passive approach to effectively cooling the space. Like any good system, it has to be properly engineered and controlled. It is important to remember that 55 degree air that you supply in a duct is a condensation risk and these passive beams are at a much higher temperature of about 62 degrees.”
Call the Commissioner
Make sure all systems are operating the way they are designed to work and that all equipment is installed in accordance with planning. There is less expense and decreased risk when the commissioning is done prior to occupancy. If it is done during the design, commissioning can avoid potential problems and uncover possible opportunities to improve performance.
“Commissioning ensures that systems operate as they are intended,” says Mathew. “In labs, commissioning can be used to identify excessive reheat energy use and control sequences that are not properly implemented, such as air change setbacks during unoccupied periods.”
Also, utility companies offer a “Savings by Design” program that reimburses for half the initial capital cost of an energy saving measure, up to $150,000 of the total incentive. In this case, the local utility company is so enthused about the University of California, Berkeley being a model project for other energy use facilities, such as labs, that it has raised the standard contribution to the maximum total incentive of $500,000, if certain performance levels are met.
“For those of you looking for sources of capital for your projects, don’t forget about energy efficiency because there is big incentive money available,” says Collins of Zimmer Gunsul Frasca Architects.
By Tracy Carbasho
We welcome your Questions and Comments
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Paul Mathew is a staff scientist at Lawrence Berkeley National Laboratory where he works on applied research in energy efficiency and environmental sustainability.
Click here to contact Paul Mathew and Joe Collins.
Plug Loads
Mechanical equipment should be right-sized to save capital and operating costs. The Lawrence Berkeley National Laboratory in Berkeley, Calif., replaced two large boilers with 11 smaller, modular boilers similar to the ones shown here. (Photo courtesy of Zimmer Gunsul Frasca Architects.)
Reheat
New chilled-beam technology can be used in labs to avoid systems that require simultaneous heating and cooling. A single-zone requiring cooling can create artificial heating and cooling loads throughout the building. (Photo courtesy of Zimmer Gunsul Frasca Architects.)
Commissioning
All systems should operate the way they were designed to work. Commissioning the building by inspecting all systems prior to occupancy can avoid potential problems in the future. (Photo courtesy of Zimmer Gunsul Frasca Architects.)