 Office Remodel / Laboratory Buildout

In this 21,000-sf laboratory build out, existing administrative office and conference spaces complement new development and quality control labs. Lab support spaces for glass washing, media preparation and chemical storage, along with new utility systems, have allowed Arriva to consolidate its operations from nearby outdated facilities.

The new facility allows for the production of materials for GLP studies, provides separation of sensitive analytical methods, improves control of quality labs, and accommodates a new lab for testing clinical samples. It will also allow storage of material for GLP and clinical studies under strict GMP conditions. Planning for a future pilot production facility in an adjacent space was completed at the outset.




Project Information
Building Owner: Arriva Pharmaceuticals
Building Location: Alameda, California UNITED STATES
Project Type: Renovation
Principal Building Function: Laboratory
Project Delivery Method: General Contractor
Project Timeline
Mar 2006Completion
Last known status: Completed
Project Cost: $2,300,000
Construction Cost: $1,900,000
Cost Per Sq. Ft: $110
About These Cost Figures
Building Information
Project Includes: Laboratory
Manufacturing
Pharmacology
Pilot Plant
Total GSF: 21,000
Project Team
Architect VDK Architects
Builder OPI Commercial Builders
Engineer - MEP TKG Consulting Engineering Inc.
Engineer - Structural Dasse Design, Inc.
Profile Created 01/05/2007
Last Updated 10/12/2007
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Lab Interior

 
Fig. 2

Lab Interior

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!