Extensive field inspection and documentation of existing conditions were conducted to verify the operation of existing systems, to evaluate new demands, and to determine the necessary corrections to meet current code and OSHPD requirements. This effort required installation of a state fire marshal approved fire-stopping assembly. A dedicated under floor exhaust system was designed for the negatively pressurized autopsy table to transfer fumes and odors to rooftop exhaust fans. Piped utilities consisted of the following medical gasses: oxygen and nitrogen, and vacuum. Systems include domestic cold water, domestic hot water supply and return, natural gas, sanitary sewer, acid resistant waste, and automatic fire protection systems, also A/C condensate drainage for the body storage room. The systems were designed in compliance with OSHPD requirements, ADA, NFPA 99 (medical gases) and NFPA 13 (fire protection). The design is also in compliance with additional OSHPD-mandated seismic strengthening requirements.
| Project Information | ||||||
| Building Owner: | Santa Clara Valley Medical Center | |||||
| Building Location: | San Jose, California UNITED STATES | |||||
| Project Type: | Renovation | |||||
| Principal Building Function: | Autopsy lab, clinical lab, morgue | |||||
| Project Timeline |
|
|||||
| Construction Cost: | $1,500,000 | |||||
| About These Cost Figures | ||||||
| Building Information | ||||||
| Project Includes: |
Forensic Healthcare Healthcare: Hospital Laboratory |
|||||
| Total GSF: | 12,400 | |||||
| Project Team | ||||||
| Architect | Cuschieri Horton | |||||
| Contractor | XL Construction | |||||
| Engineer - MEP | Greene Engineers | |||||
| Profile Created 01/05/2007 | ||||||
| Last Updated 10/12/2007 | ||||||
|
||||||