The programmatic needs, future growth patterns and corporate culture is reflected in the design of offices, common areas, and flexible space for additional laboratories.
The design for the new facility engages a steeply sloping site, which is across the street from the company’s existing laboratories in Seattle’s landmark Lake Union Steam Plant. The design complements the existing building, with large vertical windows bringing in light and view. The building was created with simple materials of brick, concrete and corrugated metal. Massing was developed to create visual interest and scale along Eastlake Avenue.
The project received an AIA Wisconsin Merit Award in 2000.
| Project Information | ||||||||||||
| Building Owner: | ZymoGenetics, Inc. | |||||||||||
| Building Location: | Seattle, WA UNITED STATES | |||||||||||
| Project Type: | Expansion | |||||||||||
| Principal Building Function: | Drug discovery | |||||||||||
| Project Delivery Method: | Fast Track | |||||||||||
| Project Timeline |
|
|||||||||||
| Construction Cost: | $12,000,000 | |||||||||||
| Cost Per Sq. Ft: | $127 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Laboratory: Biomedical Research Laboratory: Research Pharmacology Vivarium |
|||||||||||
| Total GSF: | 94,800 | |||||||||||
| Project Team | ||||||||||||
| Architect | Flad Architects | |||||||||||
| Builder | Lease Crutcher Lewis | |||||||||||
| Engineer - MEP | Affiliated Engineers Inc. (AEI) | |||||||||||
| Profile Created 02/02/2007 | ||||||||||||
| Last Updated 09/29/2008 | ||||||||||||
|
||||||||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1
Exterior
Fig. 2
Necropsy Suite

Printer Friendly Version
Send to a Friend
Complete Story
