![]() |
![]() |
Design-Bid-Build
Published August 2003
The owner of the building provides legal assurance to the contractor that the design is free of error. Change orders are allowed when the designs are incorrect or incomplete. See Design-Build.
|
Circulate to:
[ ] [ ] [ ] Notes: |
Copyright 2008 Tradeline Inc. All Rights Reserved ISSN: 1096-4894 | |