Hughes Hall is a five-story building with 264,000 gsf of space, including research and teaching laboratories, lecture halls, classrooms, a library, offices, and workshops. The renovation project was complex—the most difficult every undertaken by the University. Renovation included numerous exterior and interior improvements, requiring 11 phases of construction over 26 months to keep the building fully operational and occupied during the work.
Most of the building's infrastructure on five floors was replaced, including 11 air handlers, a patchwork of electrical systems, and 153 laboratory fume hoods. The project also resolved building code deficiencies and included selective demolition and renovations.
Replacement of building systems accounted for much of the work. They had reached the end of their service life spans, required much maintenance, were inadequate for modern lab usage, and were highly energy inefficient. Occupants of Hughes Hall complained that chemical smells permeated the building, and there were concerns about life safety, building code compliance, and ADA issues.
The project also included remodeling the existing instrument lab, electronics shop, machine shops, and most of the chemistry research and teaching labs. New lecture hall seating was provided from unused funds remaining at the end of the project.
| Project Information | ||||||||||||
| Building Owner: | Miami University of Ohio | |||||||||||
| Owner Contact: | Jack Williams, Project Manager | |||||||||||
| Building Location: | Oxford, Ohio UNITED STATES | |||||||||||
| Project Type: | Renovation | |||||||||||
| Principal Building Function: | Chemistry Department classrooms, labs, library, offices | |||||||||||
| Project Delivery Method: | Design/Bid/Build | |||||||||||
| Project Timeline |
|
|||||||||||
| Construction Cost: | $14,600,000 | |||||||||||
| Cost Per Sq. Ft: | $67 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Chemistry Education: Administration Education: Chemistry Education: Lecture Or Seminar Hall Education: Library Laboratory: Chemistry Laboratory: Research Laboratory: Teaching Library Office: Researcher |
|||||||||||
| Total GSF: | 263,728 | |||||||||||
| Total NSF: | 168,503 | |||||||||||
| Efficiency: | 64% | |||||||||||
| Building Services: | DI, N2, compressed air, natural gas | |||||||||||
| Special Equip: | Dedicated process water cooling system | |||||||||||
| HVAC Req: | 2.1 cfm/nsf | |||||||||||
| Structure/Foundation: | Braced-fram steel with concrete spread footings | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 11' x 22' research; 11' x 36' teaching | |||||||||||
| Fume Hoods: | 200 | |||||||||||
| Biosafety Cabinets: | 2 Class II, Type A | |||||||||||
| Project Team | ||||||||||||
| Architect | URS Corporation | |||||||||||
| Builder | Ardalan Construction | |||||||||||
| Consultant - Laboratory Planner | Health, Education + Research Associates Inc. | |||||||||||
| Contractor - Electrical | RPC Mechanical | |||||||||||
| Contractor - Electrical | ESI | |||||||||||
| Engineer - HVAC | Langdon | |||||||||||
| Supplier - Air Handlers | Trane Company | |||||||||||
| Supplier - Building Automation Controls | Siemens Building Technologies | |||||||||||
| Supplier - Casework | A.T. Villa USA | |||||||||||
| Supplier - Fume Hood Controls | Siemens Building Technologies | |||||||||||
| Supplier - Fume Hoods | Kewaunee Scientific Corporation | |||||||||||
| Supplier - Fume Hoods | Fisher Hamilton | |||||||||||
| Supplier - Fume Hoods | Labconco Corporation | |||||||||||
| Profile Created 03/26/2003 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||