While the exterior was completed in 2005, interior build out and full occupancy will not take place until May 2008. The complex will accommodate 374 people, of which approximately 274 will be graduate students, 48 will be faculty members, and the remainder will be post-doctoral fellows, research scientists, and support staff.
The concept of constructing a building for the science and engineering colleges necessitated a delicate design balance to create a collaborative faculty environment, to separate classrooms from research labs, to satisfy the space requirements of the two departments, and to meet construction codes.
Topping the University’s wish list of what the SERCC can achieve are an open-concept research space, secure labs, high-tech classroom space, and faculty-student access.
The SERCC design requisites call for the building to be flexible and to provide a collaborative faculty environment with adaptable space allocations. Flexibility is achieved by having infrastructure for as many as 80 fume hoods per floor with variable exhaust techniques, providing proper shielding from nuclear magnetic resonance (NMR) equipment by installing soft iron in the affected floors and ceilings, and isolating vibrations that could disturb sensitive lasers and other instruments.
Faculty offices will be openly accessible from the elevators with unsecured entry, while the labs will require card access. The open-lab concept will be achieved by providing a common linear equipment room (LER)—a 12-foot wide room running the length of the building—with labs on both sides. The LER will provide space for common items, such as small bench-top equipment and ice machines. Common general lab areas will be located on each floor for common use equipment and services, including cold rooms, dishwashing facilities, x-ray and gas chromatography, and NMR equipment.
The complex comprises a total of 170,000 sf with 130,000 sf for research space and the remainder for lecture halls and classrooms. The $55-million complex consists of one building with three science floors dedicated to synthetic chemistry, biochemistry, and biotechnology, as well as two engineering floors for materials engineering and biomedical engineering. Classrooms are located in a nearby building connected to a red brick drum structure housing a 500-seat auditorium.
The finished product is a beautiful complex, complete with useful classrooms and plenty of space for interaction, awaiting the final interior build-out and occupancy. The first floor of the research facility is designated for the cleanroom with wet, dry, and laser labs. The second floor may be used for bio-medical engineering, the third may contain a BSL-3 facility for bio-medical engineering, the fourth will be utilized for bio-chemistry and theory/computation, and the fifth will house synthesis wet labs.
| Project Information | ||||||
| Building Owner: | University of Houston | |||||
| Building Location: | Houston, Texas UNITED STATES | |||||
| Project Type: | New Construction | |||||
| Principal Building Function: | Bio-nanotechnology research and fabrication | |||||
| Project Timeline |
|
|||||
| Construction Cost: | $55,000,000 | |||||
| About These Cost Figures | ||||||
| Building Information | ||||||
| Project Includes: |
Biochemistry Biomedical Biotechnology Chemistry Cleanroom Education Engineering Interdisciplinary Research Laboratory Research |
|||||
| Total GSF: | 170,000 | |||||
| Project Team | ||||||
| Architect | Cesar Pelli & Associates, Inc. | |||||
| Builder | Vaughn Construction | |||||
| Profile Created 01/10/2007 | ||||||
| Last Updated 10/12/2007 | ||||||
|
||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Exterior

Printer Friendly Version
Send to a Friend
Complete Story