 Interdisciplinary Science and Technology Building I

Because lab spaces can be adjusted to respond to each project’s needs and accommodate new research equipment with only minor modification, the ISTB I design fosters and endorses teamwork. The $51.2-million structure is truly interdisciplinary, housing the new Center for Social Dynamics and Complexity, the Center for Metabolic Study, and the Magnetic Resonance Research Center, as well as the social insect research, neural science and engineering, and cell and tissue engineering groups. These departments and groups have access to and share graduate and research education laboratories, offices, conference rooms, support spaces, BSL-3 laboratories, a magnetic resonance suite, data center, and a two-level basement with a 40,000-sf vivarium.

The construction process was put on fast track to meet the needs of new faculty members arriving with their high-profile projects, and to keep up with an accelerated pace of funding. Other challenges of the project were space constraints at the site--located at the very center of a 55,000 student campus and the highly technical aspects of the vivarium, magnetic resonance suite, data center and BSL-3 labs. Construction services included full-time on-site construction supervision and inspections, quality control, safety program, cost monitoring, schedule control, site management, shop drawing administration, change order management, and systems installation.

ISTB I’s design and construction fulfill the need for collaboration and cooperation to promote advances in research.




Project Information
Building Owner: Arizona State University
Building Location: Tempe, Arizona UNITED STATES
Project Type: New Construction
Principal Building Function: Research and teaching facility
Project Delivery Method: Construction Management
Project Timeline
Oct 2003Planning Start
Oct 2004Design Start
Nov 2005Construction Start
Apr 2006Completion
Last known status: Completed
Project Cost: $59,000,000
Construction Cost: $58,970,608
Cost Per Sq. Ft: $327
About These Cost Figures
Building Information
Project Includes: Biocontainment
Data Center
Education
Engineering
Interdisciplinary Research
Laboratory
Nuclear Magnetic Resonance
Vivarium
Total GSF: 180,000
Project Team
Architect Perkins+Will
Builder Gilbane Building Company
Engineer - MEP BR+A/Bard,Rao + Athanas Consulting Engineers Inc.
Engineer - Structural KPFF Consulting Engineers
Laboratory Planner GPR Planners Collaborative, Inc.
Supplier - Building Automation Controls Johnson Controls Inc.
Supplier - Concrete Baker and Associates
Supplier - Glass Block Walters & Wolf
Supplier - Laboratory Equipment ISEC Inc.
Supplier - Precast Coreslab Structures (LA) Inc
Profile Created 03/02/2007
Last Updated 10/12/2007
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Exterior at Night

 
Fig. 2

Lab Interior

 

 Related Resources