The lab was designed with a raised floor and to accommodate approximately 300 Sun server units. The primary electrical service from the utility company is designed to serve the entire building for increased electrical service reliability at a lower energy cost. The design also includes a 4000 amp double-ended outdoor substation with 2500 kVA dry type transformer at each end for redundancy. The electrical load for the server lab is designed for 200 watts/sf, about three to four times the normal power requirement. Special wireways were designed under the raised floor providing flexibility, and to serve a variety of servers. The HVAC system is designed with N+1 redundancy on all equipment including the new floor mounted air conditioning units, chillers and chilled water pumps. Thirty 30-ton capacity floor mounted computer room air conditioning (CRAC) units were designed and located to minimize usage of data center floor space and optimize the distribution of air for proper control of temperature and relative humidity. Humidification was designed in certain CRAC units to optimize the design for operation and cost effectiveness. Additional computerized controls were installed to monitor and alarm the data center environmental conditions, equipment performance, energy consumption, equipment failure alarm, and optimize equipment energy use. Re-routing of the main water supply and converting the conventional wet fire protection system to approved Pre-Action system minimizes potential water damage to the new lab space below.
We welcome your Questions and Comments
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
| Project Information | ||||||
| Building Owner: | Sun Microsystems | |||||
| Building Location: | Menlo Park, California UNITED STATES | |||||
| Project Type: | Renovation | |||||
| Principal Building Function: | Demonstration lab and server testing lab | |||||
| Project Timeline |
|
|||||
| Construction Cost: | $10,000,000 | |||||
| About These Cost Figures | ||||||
| Building Information | ||||||
| Project Includes: |
Computers Customer Support Data Center Laboratory |
|||||
| Total GSF: | 18,000 | |||||
| Project Team | ||||||
| Architect | Studios Architecture | |||||
| Engineer | Jacobs Engineering | |||||
| Engineer - MEP | Greene Engineers | |||||
| Profile Created 01/05/2007 | ||||||
| Last Updated 10/12/2007 | ||||||
|
||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1
Electrical Engineering
Fig. 2
Testing Lab

Printer Friendly Version
Send to a Friend
Complete Story