Niles Campus
Published January 2007
This project entails 36,900 sf of additions and 67,000 sf in renovations to the Department of Surgery, a new outpatient clinic, imaging department additions and renovations, birthing unit renovations, and nursing unit renovations.
To implement a system-wide upgrade that included $20 million in renovations and additions, the design team developed the concept of smaller, strategically placed additions (in lieu of a single, larger addition) that generated a greater overall impact on the facility, both inside and out. The widespread distribution of the additions and renovations allowed for several departments to expand and modernize while also strengthening the corridor system that connects them. Space was added where needed while maintaining positive aspects of existing adjacencies and circulation.
The design “adopted” the existing buildings as an effective background for the new additions, creating a smaller scaled, more welcoming architectural foreground along much of the campus perimeter. The redefined and refocused exterior and interior supports clear way-finding and features Planetree™ elements throughout.
| Building Owner: |
 |
Lakeland Regional Health System |
 |
|
Building Location:
|
|
Niles, Michigan UNITED STATES
|
 |
|
Project Type:
|
|
New Construction,Renovation
|
 |
|
Principal Building Function:
|
|
Regional hospital |
 |
|
Project Delivery Method:
|
|
Construction Management
|
 |
|
Project Timeline
|
|
| Jul 2002 | Construction Start |
| Jan 2005 | Completion |
|
Last known status: Completed
|
|
 |
| Project Cost: |
|
$60,000,000 |
| Construction Cost: |
|
$20,700,000 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Healthcare
Healthcare: Ambulatory Outpatient Clinic
Healthcare: Hospital
Healthcare: Imaging
Healthcare: Surgery
|
| Total GSF: |
|
103,900 |
 |
 |
|
Architect
|
|
The S/L/A/M Collaborative
|
 |
 |
 |
 |
|
Engineer - Structural
|
|
The S/L/A/M Collaborative
|
 |
|
Interior Design
|
|
The S/L/A/M Collaborative
|
 |
|
Landscape Architect
|
|
The S/L/A/M Collaborative
|
 |
 |
 |
| Profile Created 01/05/2007 |
| Last Updated 02/02/2007 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|
Circulate to:[ ]
[ ]
[ ]
Reception Area Photo courtesy of The S/L/A/M Collaborative (Woodruff-Brown Photography)
Waiting Room Photo courtesy of The S/L/A/M Collaborative (Woodruff-Brown Photography)
Waiting Room Photo courtesy of The S/L/A/M Collaborative (Woodruff-Brown Photography) Notes:
|