College of Veterinary Medicine, Sisson Hall
Completion Date August 2002
Published March 2001
This new 100,000-sf teaching and research facility replaces an antiquated 1959 building. The building contains teaching and research laboratories, administrative and faculty offices (including the Dean's suite), conference rooms, classrooms, two 150-seat stepped floor lecture halls, and the veterinary school library.
The complex program is organized around clearly marked public space and circulation paths that provide for an open and collegial environment. The primary public space is a double height department "living room" that looks out on to a new academic green. Secure areas such as the research labs are located on the upper two floors of the building thus removing them from the major public circulation routes and giving them efficient access to lab exhaust fans which are in the mechanical attic space of the building's traditional sloped roof.
| Building Owner: |
 |
Ohio State University |
 |
|
Owner Contact:
|
|
John Frazier
|
 |
|
Building Location:
|
|
Columbus, OH UNITED STATES
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Research and Instructional |
 |
|
Project Timeline
|
|
| Oct 1997 | Planning Start |
| May 1998 | Design Start |
| Aug 2000 | Construction Start |
| Aug 2002 | Target Completion |
|
Last known status: Construction
|
|
 |
| Project Cost: |
|
$27,000,000 |
| Construction Cost: |
|
$21,500,000 |
| Cost Per Sq. Ft: |
|
$184 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Education
Education: Administration
Education: Classroom
Education: Faculty Office
Education: Lecture Or Seminar Hall
Laboratory: Research
Laboratory: Teaching
Library
Vivarium
|
| Total GSF: |
|
109,000 |
| Total NSF: |
|
56,403 |
| Efficiency: |
|
52% |
 |
|
Building Population:
|
|
500
|
|
People Density:
|
|
141 gsf/person
|
|
Building Services:
|
|
Gas, vacuum, DI
|
|
Office Size:
|
|
140 sf NSF
|
|
Structure/Foundation:
|
|
Reinforced concrete foundation, steel frame superstructure
|
 |
|
Lab Module:
|
|
10' x 22'
|
|
Casework Mat'l:
|
|
Metal with chemical resistant laminate top
|
|
Fume Hoods:
|
|
Chemical fume hoods: 26 @ 4'; radioisotope: 2 @ 4'
|
|
Biosafety Cabinets:
|
|
25 @ 4', Class II Type A
|
 |
 |
|
Architect
|
|
Ballinger
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Profile Created 03/31/2001 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|