| Project Information | ||||||
| Building Owner: | Stanford University | |||||
| Building Location: | Palo Alto, CA USA | |||||
| Project Type: | New Construction | |||||
| Principal Building Function: | Teaching and research laboratories with advanced telecommunications systems, magnetic shielding, high temperature/high pressure facilities with explosion protection, gas detection systems and high ceilings. Computer facilities and classrooms. | |||||
| Project Delivery Method: | Construction Management (CM) | |||||
| Project Timeline |
|
|||||
| Project Cost: | $26,628,269 | |||||
| Construction Cost: | $15,925,000 | |||||
| Cost Per Sq. Ft: | $215 | |||||
| About These Cost Figures | ||||||
| Building Information | ||||||
| Project Includes: |
Education Education: Classroom Headquarters Laboratory: Dry And Wet |
|||||
| Total GSF: | 74,000 | |||||
| Total NSF: | 42,250 | |||||
| Building Services: | Potable hot and cold water drench hoses and safety showers, eye wash units, compressed air, laboratory air, laboratory gas, laboratory vacuum, recirculating deionized water, chilled water, lab electrical, phone and data. | |||||
| Project Team | ||||||
| Architect | Anshen+Allen | |||||
| Consultant - Laboratory Design | Research Facilities Design (RFD) | |||||
| Contractor | Dinwiddie Construction | |||||
| Profile Created 01/01/1994 | ||||||
| Last Updated 04/04/2006 | ||||||
|
||||||