 College of Veterinary Medicine

Under the aegis of the University and the State University Construction Fund, Perkins & Will, in a joint venture with Davis Brody & Associates, prepared a master plan for the redevelopment of the College. After assessing current operations and projections of program needs and staffing, a staged program was prepared that will bring patient care, academic and research facilities to acceptable standards. The new 325,000-sf Animal Research and Teaching Hospital provides a new image to support Cornell's position as a leader in veterinary medical education and research with 150,000 sf. of flexible research space located above a 150,000 sf. full-service animal hospital, Cornell can effectively service the needs of top researchers and students.




Project Information
Building Owner: Cornell University
Owner Contact: William C. Anderson, Director of Facilities Administration
Building Location: Ithaca, NY UNITED STATES
Project Type: New Construction
Principal Building Function: Veterinary Research Facility & Animal Hospital
Project Delivery Method: General Contractor
Project Timeline
Mar 1987Planning Start
Sep 1988Design Start
Mar 1992Construction Start
Dec 1995Completion
Last known status: Completed
Project Cost: $100,000,000
Construction Cost: $68,000,000
About These Cost Figures
Building Information
Project Includes: Animal Hospital
Education
Research
Total GSF: 321,000
Total NSF: 290,000
Efficiency: 90%
Building Population: 300
People Density: 1070 gsf/person
Building Services: DI, N2, O2, N2O, Air, Vacuum, Natural Gas
Power Req: 5.8 watts/nsf
HVAC Req: 1.7 cfm/nsf
Laboratory Parameters
Lab Module: Lab Bench 5' x 12' Typical
Casework Mat'l: Wood, Maple, Plastic Laminate Tops
Fume Hoods: 51; 5' wide x 3' deep
Biosafety Cabinets: 66; Class 2
Project Team
Architect Davis, Brody & Associates
Architect Perkins+Will
Builder Perini
Supplier Johnson Controls Inc.
Supplier - Fume Hoods Duralab
Supplier - HVAC Buffalo Air Handling Division
Profile Created 12/01/1995
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Floorplan

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!