Evergreen Research Building


Published January 1991

Project Information
Building Owner: Syntex (USA) Inc.
Building Location: San Jose, CA USA
Project Type: New Construction
Project Timeline
Jan 1991Completion
Last known status: completed
Construction Cost: $61,000,000
Cost Per Sq. Ft: $176
About These Cost Figures
Building Information
Project Includes: Laboratory: Dry And Wet
Laboratory: Research
Total GSF: 347,000
Total NSF: 212,289
Project Team
Architect MBT Architecture
Consultant - Laboratory Design Research Facilities Design (RFD)
Profile Created 01/01/1991
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
Circulate to:

[ ]

[ ]

[ ]

Laboratory

Laboratory

Notes:














Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894