The Science Facilities organizes its services into three components: laboratories housed in a linear block along the site's north-south axis; classrooms and lecture halls located in a rectangular wing with gable ends running perpendicular to the laboratory block; and faculty offices situated in a cylindrical structure, visible primarily from the west.
The focal point of the facilities?the Commons?is a three-story, skylit polygonal atrium with a helical staircase. This space is intended as a place for informal gatherings and interchange among students and faculty. The facilities extensive mechanical equipment is incorporated in the attic of the laboratory and classroom wings.
The facades are finished with materials, colors and fenestration resembling other buildings on the college campus. The laboratory block and the classroom wing are made of ochre-brown local brick and laid in common bond with pitched slate roofs. The office structure is dark gray brick with a dome skylight of clear glass. The curved wall of the 150-seat auditorium, which emerges from the classroom wing, is clad with veined Kasota limestone laid in stacked bond.
| Project Information | ||||||||||||
| Building Owner: | Augustana College | |||||||||||
| Owner Contact: | John L. Kindschuh, Senior Vice President | |||||||||||
| Building Location: | Rock Island, IL UNITED STATES | |||||||||||
| Project Type: | New Construction | |||||||||||
| Principal Building Function: | Science facility for the biology, chemistry and physics departments along with general classrooms for the College. | |||||||||||
| Project Delivery Method: | Construction Management | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $21,500,000 | |||||||||||
| Construction Cost: | $18,400,000 | |||||||||||
| Cost Per Sq. Ft: | $161 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Biology Chemistry Education: Classroom Education: Physics |
|||||||||||
| Total GSF: | 114,000 | |||||||||||
| Total NSF: | 61,108 | |||||||||||
| Efficiency: | 54% | |||||||||||
| Building Population: | 540 | |||||||||||
| People Density: | 211 gsf/person | |||||||||||
| Special Equip: | Environmental rooms | |||||||||||
| Office Size: | 140 NSF | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 11' x 28' | |||||||||||
| Casework Mat'l: | Custom wood with epoxy and plastic laminate tops | |||||||||||
| Fume Hoods: | 74 | |||||||||||
| Project Team | ||||||||||||
| Architect | Ellenzweig Inc. | |||||||||||
| Builder | Kraus Anderson Construction Co. | |||||||||||
| Construction - Document Control | Fred Nashed,AIA | |||||||||||
| Consultant - Accoustical | Cambridge Acoustical | |||||||||||
| Consultant - Audio Visual | Nicholas Browse & Associates | |||||||||||
| Consultant - Mechanical | BR+A/Bard,Rao + Athanas Consulting Engineers Inc. | |||||||||||
| Consultant - Structural | LeMessurier Consultants Inc. | |||||||||||
| Supplier - Casework | Fisher Hamilton | |||||||||||
| Supplier - Fume Hoods | Fisher Hamilton | |||||||||||
| Profile Created 09/01/1998 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Floorplan
Exterior

Printer Friendly Version
Send to a Friend
Complete Story
