 Engineering Science Building

The building has a wide range of laboratory spaces. To facilitate access of heavy equipment, the fluid mechanics lab and the materials science lab are located at grade level and open directly onto the street. Wet labs for chemistry and physics are located on the second floor.

Second-floor labs are accessed through a secure corridor from a hillside entrance. Natural light for this space is provided through three roof monitors. A series of tilted roof panels over the second-floor labs and lobby facilitate air movement through the building. A second-floor multi-purpose flex lab is situated to take advantage of views across campus and down the Pacific coast.




Project Information
Building Owner: California Maritime Academy
Owner Contact: Thomas Coffin, Chief of Architecture and Engineering, CSU System
Building Location: Vallejo, CA UNITED STATES
Project Type: New Construction
Principal Building Function: Interdisciplinary Physics and Chemistry Laboratories
Project Delivery Method: Bid
Project Timeline
Sep 1995Planning Start
Oct 1995Design Start
Sep 1997Construction Start
Apr 1999Target Completion
Last known status: Construction
Project Cost: $4,300,000
Construction Cost: $3,600,000
Cost Per Sq. Ft: $225
About These Cost Figures
Building Information
Project Includes: Computers
Education: Classroom
Engineering
Laboratory: Teaching
Office
Total GSF: 16,000
Total NSF: 10,000
Efficiency: 63%
Building Population: 200
People Density: 80 gsf/person
Building Services: Vacuum, Compressed Air
Special Equip: 150 mph wind tunnel
Office Size: 100 NSF
Power Req: 15.75 watts/nsf
Structure/Foundation: Cast-in-place concrete shear walls/ Steel braced frames with concrete grade beams and soil nail tie-backs
Laboratory Parameters
Lab Module: 10' x 10'
Casework Mat'l: Wood with plastic laminate veneer and epoxy countertops
Fume Hoods: 4:6', 1:4'
Project Team
Architect NBBJ
Consultant - MEP Engineer Mazzetti and Associates
Consultant - Structural Forell/Elsessor Engineering
Profile Created 04/01/1999
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Floorplan

 
Fig. 2

Exterior

 

 Related Resources