A concrete office section buffers laboratories from vibrations without sacrificing windowed offices for both faculty and student. The laboratories include electronic materials, magnetometry, spin stands, epitaxy, chemistry prep and x-ray topography. The entry staircase exhaust towers anchor at ends of the building, creating a volumetric symmetry, in front of Hamerschlag Hall. The laboratories are predominantly internal for electrophysics optics-type research in electronic material for data storage technology.
Immediate stairs connect the three floors, as well as the main gathering stair at the entry hub. The building is designed to encourage the use of stairs to increase interaction among scientists. Conference rooms and break areas are located at these junctures maximizing views of downtown Pittsburgh from Hamerschlag Hall's landmark tower.
| Project Information | ||||||||||||
| Building Owner: | Carnegie Mellon University | |||||||||||
| Building Location: | Pittsburgh, PA UNITED STATES | |||||||||||
| Project Type: | New Construction | |||||||||||
| Principal Building Function: | Electronic Materials Technology Building | |||||||||||
| Project Delivery Method: | Bid | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $17,000,000 | |||||||||||
| Construction Cost: | $13,200,000 | |||||||||||
| Cost Per Sq. Ft: | $160 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Education Education: Classroom Education: Faculty Office Engineering Laboratory: Research Laboratory: Teaching |
|||||||||||
| Total GSF: | 75,000 | |||||||||||
| Total NSF: | 42,400 | |||||||||||
| Efficiency: | 57% | |||||||||||
| Building Population: | 150 | |||||||||||
| People Density: | 500 gsf/person | |||||||||||
| Building Services: | Air, Gas, Vacuum, Chilled Water (2 types), Nitrogen | |||||||||||
| Office Size: | 140 NSF | |||||||||||
| Structure/Foundation: | Poured in place concrete, one way; Permanent tie back soil | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 16.5' x 22' | |||||||||||
| Casework Mat'l: | Custom wood | |||||||||||
| Fume Hoods: | 30: 5' retention | |||||||||||
| Biosafety Cabinets: | 6 | |||||||||||
| Project Team | ||||||||||||
| Architect | Payette | |||||||||||
| Builder | Mosites Construction Co. | |||||||||||
| Consultant - Civil | D'Appolonia/Meucci | |||||||||||
| Consultant - Electrical | BR+A/Bard,Rao + Athanas Consulting Engineers Inc. | |||||||||||
| Consultant - Fire Protection | R.W. Sullivan, Inc. | |||||||||||
| Consultant - Mechanical | BR+A/Bard,Rao + Athanas Consulting Engineers Inc. | |||||||||||
| Consultant - Plumbing | R.W. Sullivan, Inc. | |||||||||||
| Consultant - RF Shielding | MRA Inc. | |||||||||||
| Consultant - Site | D'Appolonia/Meucci | |||||||||||
| Consultant - Structural | R.M. Gensert Associates Inc. | |||||||||||
| Consultant - Vibration | Acentech Incorporated | |||||||||||
| Supplier - Fans | Strobic Air Corporation | |||||||||||
| Supplier - Fume Hoods | Kewaunee Scientific Corporation | |||||||||||
| Profile Created 05/01/1997 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Exterior
Floorplan

Printer Friendly Version
Send to a Friend
Complete Story