The second and third floors of the facility?approximately 17,637 gsf each?house BL 2 and BL 3 laboratories, offices for principle investigators and laboratory support space. The first floor?approximately 19,548 gsf?houses laboratories similar to the upper levels as well as a seminar room for in-house lectures, meetings and general use by the Emory University campus. The basement floor is approximately 15,240 gsf and includes a staff lounge, showers, lockers and toilets for caretakers looking after primates housed in other campus facilities. It also houses a vivarium with both a dirty and clean cage area, BL 3 rooms, general animal housing rooms, a procedure room, food and bedding storage, an isolation room for quarantine and cubicle rooms. The Center is equipped with a rooftop penthouse where the major HVAC hardware is located.
The main entrance to the facility emerges from the building's curved façade. Exterior materials include a random-stacked, light-colored stone veneer at the base of the structure, metallic panels at the entry roof, brick veneer with precast bands and punched windows, as well as silver metallic painted copings and metal insert panels in the glass curtain walls. A staircase connects the first, second and third floors and is designed to encourage interaction between colleagues.
| Project Information | ||||||||||||
| Building Owner: | Emory University | |||||||||||
| Owner Contact: | Dr. Tom Insel, Director | |||||||||||
| Building Location: | Atlanta, GA UNITED STATES | |||||||||||
| Project Type: | New Construction,Expansion | |||||||||||
| Principal Building Function: | Research Laboratory | |||||||||||
| Project Delivery Method: | Lump Sum | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $13,000,000 | |||||||||||
| Construction Cost: | $11,000,000 | |||||||||||
| Cost Per Sq. Ft: | $145 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Education: Classroom Laboratory: Biomedical Research Laboratory: Research Laboratory: Wet Vivarium |
|||||||||||
| Total GSF: | 76,035 | |||||||||||
| Total NSF: | 58,315 | |||||||||||
| Efficiency: | 77% | |||||||||||
| Building Population: | 1580 | |||||||||||
| People Density: | 123 gsf/person | |||||||||||
| Building Services: | Vacuum, Gas, Manifolded LN2, Manifolded C02, Emergency Generator, Controlled Access Systems | |||||||||||
| Office Size: | 120 NSF | |||||||||||
| Power Req: | Not available | |||||||||||
| HVAC Req: | 1.00 cfm/nsf | |||||||||||
| Structure/Foundation: | concrete columns with caissons + spread footings , post tension concrete slabs, reinforced concrete beams | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 20' x 34' and 20' x 42' | |||||||||||
| Casework Mat'l: | Wood wall and base cabinets, resin countertops | |||||||||||
| Fume Hoods: | 25: 5' (3 isotope, 22 general purpose) | |||||||||||
| Biosafety Cabinets: | 70: Class II Type A19, Class II Type AIB3 | |||||||||||
| Project Team | ||||||||||||
| Architect | Hellmuth, Obata + Kassabaum Inc. (HOK) | |||||||||||
| Consultant - Civil | W. K. Dickson | |||||||||||
| Consultant - Fire Protection | Hellmuth, Obata + Kassabaum Inc. (HOK) | |||||||||||
| Consultant - MEP Engineer | Hellmuth, Obata + Kassabaum Inc. (HOK) | |||||||||||
| Consultant - Structural | Cecil Chan & Associates, Inc. | |||||||||||
| Profile Created 12/01/1998 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||