The facility, erected on the north central part of the campus, takes full advantage of the hillside to allow for a basement to house the animal vivarium. The main ground floor entrance opens onto a two-story gateway for the biocomplex courtyard and permits easy access to the building's administrative offices. The main floor houses a large seminar room, faculty offices, an NMR suite and two wings of main laboratory space. A three-story atrium serves as the focal point of the core area.
The second and third floors house labs and faculty offices. Specialty and core support labs are placed at the crossing of each floor and open onto the central atrium.
Specialty components at the Institute for Bioengineering and Bioscience include a magnetic resonance laboratory, cell culture facilities, an x-ray diffraction laboratory, a vivarium and a biomodeling laboratory for computational approaches to problems in biology and medicine. Typical labs provide equipment for research in bioscience, tissue cultures, synthetic and organic chemistry.
| Project Information | ||||||||||||
| Building Owner: | Georgia Institute of Technology | |||||||||||
| Owner Contact: | Richard Long, Project Director | |||||||||||
| Building Location: | Atlanta, GA UNITED STATES | |||||||||||
| Project Type: | New Construction | |||||||||||
| Principal Building Function: | Bioscience Laboratory | |||||||||||
| Project Delivery Method: | Design/Build | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $30,000,000 | |||||||||||
| Construction Cost: | $28,650,000 | |||||||||||
| Cost Per Sq. Ft: | $190 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Biology Chemistry Conference Room Education Education: Administration Education: Classroom Education: Faculty Office Laboratory: Biomedical Research Laboratory: Research Research: Biotech Vivarium |
|||||||||||
| Total GSF: | 131,600 | |||||||||||
| Total NSF: | 86,257 | |||||||||||
| Efficiency: | 65% | |||||||||||
| Building Population: | 350 | |||||||||||
| People Density: | 376 gsf/person | |||||||||||
| Building Services: | Point-of-use Di, vacuum, lab gas | |||||||||||
| Special Equip: | NMR, environmental rooms | |||||||||||
| Office Size: | 120/180 NSF | |||||||||||
| Power Req: | 18 watts/nsf | |||||||||||
| HVAC Req: | 1.7 cfm/nsf | |||||||||||
| Structure/Foundation: | Cast-in-place concrete frame with post-tensioned slabs and beams | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 260 sf | |||||||||||
| Casework Mat'l: | Wood, resin counters | |||||||||||
| Fume Hoods: | 160: 6' & 8' | |||||||||||
| Biosafety Cabinets: | 40 Class II, Type A | |||||||||||
| Project Team | ||||||||||||
| Architect | Hellmuth, Obata + Kassabaum Inc. (HOK) | |||||||||||
| Consultant - Civil | Jordan, Jones and Goulding | |||||||||||
| Consultant - MEP Engineer | Newcomb & Boyd | |||||||||||
| Consultant - Structural | Stanley D. Lindsey & Associates, Limited | |||||||||||
| Contractor | Beers Construction | |||||||||||
| Supplier - Casework | Fisher Hamilton | |||||||||||
| Supplier - Environmental Enclosures | Climate Technologies | |||||||||||
| Supplier - Flooring | Bonitz | |||||||||||
| Supplier - Fume Hoods | Fisher Hamilton | |||||||||||
| Supplier - Laboratory Fixtures | STERIS Corporation | |||||||||||
| Supplier - Laboratory Furniture | Fisher Hamilton | |||||||||||
| Profile Created 01/01/2001 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
IBB Southeast View
IBB Lobby/Atrium
Floorplan
Rendering

Printer Friendly Version
Send to a Friend
Complete Story
