 Liquid Crystal Institute/Materials Science Building

Labs are custom designed on a modular basis in an effort to provide the adaptability necessary to allow changes for the life of the facility. The mechanical systems are designed to the current state-of-the-art criteria with redundancy to allow addition of future fume hoods.

The cast-in-place concrete structure provides significant vibration damping to allow for laser intensive photometric laboratory work.




Project Information
Building Owner: Kent State University
Owner Contact: R. Michael Brown, University Architect
Building Location: Kent, OH UNITED STATES
Project Type: New Construction
Principal Building Function: Research Laboratories
Project Delivery Method: Individual Bid Packages
Project Timeline
Mar 1993Planning Start
Oct 1993Design Start
Apr 1995Construction Start
Oct 1996Completion
Last known status: Completed
Project Cost: $13,300,000
Construction Cost: $10,300,000
Cost Per Sq. Ft: $147
About These Cost Figures
Building Information
Project Includes: Auditorium
Cleanroom
Computers
Conference Room
Education
Education: Classroom
Education: Lecture Or Seminar Hall
Laboratory: Research
Laboratory: Teaching
Laboratory: Wet
Office
Total GSF: 70,000
Total NSF: 46,000
Efficiency: 65%
Building Population: 245
People Density: 285 gsf/person
Building Services: Hot and cold water, air, gas, vacuum
Special Equip: Class 10,000, 1000 and 100 clean rooms; Optical laboratories with intensive laser usage
Office Size: 110 NSF
Structure/Foundation: Cast-in-place concrete frame and floors with brick veneer & curtain wall.
Laboratory Parameters
Lab Module: l0'6 x 20'
Casework Mat'l: Fixed wood benches
Fume Hoods: 36: 5'
Project Team
Architect BHDP Architecture
Builder Mosser Construction Co.
Consultant - Electrical Scheeser Buckley Mayfield
Consultant - Mechanical Scheeser Buckley Mayfield
Consultant - Structural THP Limited
Supplier - Building Automation Controls Phoenix Controls Corporation
Supplier - Casework Collegedale Casework
Profile Created 10/01/1996
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Exterior (Distance)

Exterior (Distance)

 
Fig. 2

Lab Bench

Lab Bench

 
Fig. 3

Floorplan

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!