The project required a detailed survey of the building systems, which were fully CADD documented in an effort to reuse existing resources. Facility modifications to make the project UFAS/ADA compliant were required in restrooms and all public areas. Mechanical supply and exhaust systems were engineered to utilize the building's existing vertical chase space. New communication systems included interconnections to network the facility operating areas with local networks and to the campus central data and educational distribution system.
Exterior improvements included new windows and entrances with energy efficient glass, a new roof, lighting and restoration of exterior panels. All improvements were accomplished in keeping with the facility's original design.
| Project Information | ||||||||||||
| Building Owner: | Northwestern University | |||||||||||
| Owner Contact: | Jerome Cohen, Dean | |||||||||||
| Building Location: | Evanston, IL UNITED STATES | |||||||||||
| Project Type: | Renovation | |||||||||||
| Principal Building Function: | Research laboratories | |||||||||||
| Project Delivery Method: | General Contractor | |||||||||||
| Project Timeline |
|
|||||||||||
| Construction Cost: | $13,500,000 | |||||||||||
| Cost Per Sq. Ft: | $104 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Chemistry Education Education: Classroom Engineering Laboratory: Biomedical Research Laboratory: Dry And Wet Laboratory: Research Laboratory: Teaching Office |
|||||||||||
| Total GSF: | 130,300 | |||||||||||
| Total NSF: | 64,400 | |||||||||||
| Efficiency: | 50% | |||||||||||
| Building Population: | 200 | |||||||||||
| People Density: | 652 gsf/person | |||||||||||
| Building Services: | Central vacuum, natural gas, DI, compressed air | |||||||||||
| Office Size: | 230 NSF | |||||||||||
| HVAC Req: | 1.78 cfm/nsf | |||||||||||
| Structure/Foundation: | Concrete frame | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 10' x 23' | |||||||||||
| Casework Mat'l: | Wood cabinets refurbished, epoxy resin countertops | |||||||||||
| Fume Hoods: | 48: 5' | |||||||||||
| Biosafety Cabinets: | 14: 5' | |||||||||||
| Project Team | ||||||||||||
| Architect | Knight Advanced Technology-Architects Engineers Planners | |||||||||||
| Builder | Walsh Construction Company | |||||||||||
| Supplier - Biosafety Cabinets | The Baker Company | |||||||||||
| Supplier - Casework | Kewaunee Scientific Corporation | |||||||||||
| Supplier - Fume Hoods | Kewaunee Scientific Corporation | |||||||||||
| Profile Created 04/01/1994 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||