The complex provided swing-space that allowed construction to proceed in far fewer phases than would otherwise be the case. This approach allows the majority of the science labs to move into the Complex at one time. State-of-the-art labs serve the chemistry, astronomy, physics, biology, geology, electrical, engineering, civil engineering and mechanical engineering departments. Computer labs and general classrooms are also included.
| Project Information | ||||||||||||
| Building Owner: | Norwich University | |||||||||||
| Owner Contact: | David Magida, Chief Administrative Officer | |||||||||||
| Building Location: | Northfield, VT UNITED STATES | |||||||||||
| Project Type: | Expansion | |||||||||||
| Principal Building Function: | Academic, Science, Engineering Facility | |||||||||||
| Project Delivery Method: | General Contractor | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $15,000,000 | |||||||||||
| Construction Cost: | $9,400,000 | |||||||||||
| Cost Per Sq. Ft: | $87 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Astronomy Biology Chemistry Computers Education Education: Classroom Education: Physics Engineering Geology Laboratory: Dry And Wet Laboratory: Research Laboratory: Teaching Life Sciences |
|||||||||||
| Total GSF: | 108,000 | |||||||||||
| Total NSF: | 70,000 | |||||||||||
| Efficiency: | 65% | |||||||||||
| Building Services: | Natural gas, vacuum, comp. air, deionized water | |||||||||||
| Office Size: | 140-160 NSF | |||||||||||
| Structure/Foundation: | Steel frame/concrete spread footings | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 11' x 32' | |||||||||||
| Casework Mat'l: | Plastic laminate/epoxy | |||||||||||
| Fume Hoods: | 4'-6' | |||||||||||
| Project Team | ||||||||||||
| Architect | The S/L/A/M Collaborative | |||||||||||
| Architect - Associate | McKnight Associates, Architects, P.C. | |||||||||||
| Builder | John Russell Corporation | |||||||||||
| Consultant - Audio Visual | Acentech Incorporated | |||||||||||
| Consultant - Engineer | Hallam Associates | |||||||||||
| Consultant - Geotechnical | Civil Engineering Associates, Inc. | |||||||||||
| Consultant - Laboratory Planner | Research Facilities Design (RFD) | |||||||||||
| Consultant - Surveyor | Civil Engineering Associates, Inc. | |||||||||||
| Supplier - Fume Hoods | Fisher Hamilton | |||||||||||
| Profile Created 08/01/1997 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||