 Vernal G. Riffe, Jr. Building

The ten-story addition is located adjacent to the University Medical Center and houses research labs, faculty offices, the new combined Library for the Colleges of Biological Sciences and Pharmacy and the Pharmacy Instrumentation Center. In addition, partial renovations were made to Parks Hall, which houses the College of Biological Sciences.

The 34,000-sf Library is located on floors one and two of the new addition. The first floor also contains a chemical instrumentation center, with sophisticated measuring and analytical equipment. Floors four through nine house laboratories and support space for research in pharmaceutics, medicinal chemistry, pharmacology, biochemistry, molecular genetics and microbiology.




Project Information
Building Owner: Ohio State University
Owner Contact: Jill Morelli, AIA, University Architect
Building Location: Columbus, OH UNITED STATES
Project Type: Expansion,Renovation
Principal Building Function: Research Laboratory
Project Delivery Method: General Contractor
Project Timeline
Jan 1990Planning Start
Feb 1990Design Start
Sep 1992Construction Start
Nov 1994Completion
Last known status: Completed
Project Cost: $21,700,000
Construction Cost: $18,400,000
Cost Per Sq. Ft: $143
About These Cost Figures
Building Information
Project Includes: Biology
Education
Education: Classroom
Education: Faculty Office
Laboratory: Research
Laboratory: Wet
Library
Research
Total GSF: 128,000
Total NSF: 72,000
Efficiency: 56%
Building Population: 194
People Density: 660 gsf/person
Building Services: Hot water, distilled water, gas, compressed air, N2, acid waste
Office Size: 140-faculty NSF
Power Req: 62 watts/nsf
HVAC Req: 2.08 cfm/nsf
Structure/Foundation: Rigid precast concrete superstructure with caissons and grade beams
Laboratory Parameters
Lab Module: 11' x 25'
Casework Mat'l: Wood casework, epoxy resin countertops
Fume Hoods: 79: 4',5',6'
Biosafety Cabinets: Provision for six N.I.C.
Project Team
Architect Perkins+Will
Architect Burgess & Niple
Builder Sherman R. Smoot & Co.
Consultant - Civil John E. Foster & Associates, Inc.
Consultant - Electrical Buckeye Electrical Co.
Consultant - Fire Protection Julian Speer
Consultant - MEP Engineer W. E. Monk's Company
Consultant - Plumbing Julian Speer
Supplier - Building Automation Controls Johnson Controls Inc.
Supplier - Casework Fisher Hamilton
Supplier - Fume Hoods Fisher Hamilton
Supplier - HVAC Trane Company
Profile Created 11/01/1994
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Exterior

 
Fig. 2

Floorplan

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!