 Center for Environmental Services and Technology Management
The Center's 75,000-gsf building, with a 115-foot communication tower, is organized into three components: research labs and offices, a business incubator and an entry rotunda. The facility is the first physical expansion of the University beyond its original campus. In addition, separate from the buildig itself, an array of free-standing PV pylons are included on the site.

Major programs accommodated in the three-story structure include:
The Atmospheric Science Research Center -- a unit researching atmospheric phenomena and their environmental consequences;
The Center for X-Ray Optics -- an industrial application researching the next generation of computer chips and medical diagnostics;
The Advanced Materials Laboratory -- a facility focusing on the physics and chemistry of new materials;
The Center for Excellence in Science Education -- a program to foster scientific understanding through networking with University resources;
The National Weather Services Regional Forecast Center -- a center with activities in the field of basic hydrometeorology; and
The Business Incubator Program -- a major facility for high-technology enterprises dedicated to the commercial application of research findings.




Project Information
Building Owner: State University of New York, Albany
Owner Contact: Donald Del Manzo, V.P., Facilities
Building Location: Albany, NY UNITED STATES
Project Type: New Construction
Principal Building Function: Research Facility and New York State Designated Center for Advanced Technology
Project Delivery Method: Construction Management
Project Timeline
Nov 1993Planning Start
May 1994Design Start
Oct 1995Construction Start
Aug 1997Completion
Last known status: Completed
Construction Cost: $14,000,000
Cost Per Sq. Ft: $180
About These Cost Figures
Building Information
Project Includes: Business Incubator
Education: Classroom
Laboratory: Dry
Laboratory: Research
Office
R&D
Total GSF: 76,187
Total NSF: 53,647
Efficiency: 70%
Building Population: 215
People Density: 360 gsf/person
HVAC Req: 15 cfm/nsf
Structure/Foundation: Spread footings, steel frame, metal deck/concrete slab
Laboratory Parameters
Lab Module: 6' x 25'
Casework Mat'l: Metal lab casework with glass doors, resinous countertops
Fume Hoods: 20: 3' x 4" - 3' x 8"
Project Team
Architect Cannon Design
Builder MLB Industries, Inc.
Consultant - Landscape Architect Hargreaves Associates
Consultant - Photovoltaics Solar Design Associates
Engineer Cannon Design
Supplier Siemens Building Technologies
Supplier - Building Automation Controls Landis & Gyr
Supplier - Casework Kewaunee Scientific Corporation
Supplier - Fume Hoods Kewaunee Scientific Corporation
Supplier - HVAC Patterson Kelly
Supplier - HVAC McQuay International
Profile Created 07/01/1998
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Exterior

The Center for Environmental Services and Technology Management is recognized as the largest PV facility in the U.S. This project is the first physical expansion to the University beyond its original campus.

 
Fig. 2

Floorplan

The 75,000-gsf building is organized into three components: research labs and offices, a business incubator and an entry rotunda.

 