The University of California, Irvine's Engineering Unit 2, a research and teaching facility, is located at the College of Engineering. It includes laboratories for programs in civil, mechanical, electrical and computer engineering research and houses an academic computer center, seminar rooms and faculty/administrative offices.
The design of the building separates vibration-sensitive micro fabrication laboratories (located in one wing) from vibration-producing civil and mechanical engineering laboratories (located in the opposite wing). Department and faculty offices are located in the bridge element between both wings to promote interaction and future flexibility for faculty allocation as programs expand or contract. The facility integrates the smaller existing award-winning Engineering Research Building by giving it pre-eminence in the palm tree-lined quadrangle.
The building exterior is a combination of painted poured-in-place concrete with tile trim. The bridge building is lined with tile panels on a steel frame. The principal interior spaces are organized around a main lobby in the east wing with views toward the new quadrangle and a series of interactive spaces located at corridor ends, terraces and balconies.
| Building Owner: |
 |
University of California, Irvine |
 |
|
Owner Contact:
|
|
Laurel Wilkening, Chancellor
|
 |
|
Building Location:
|
|
Irvine, CA UNITED STATES
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Research and Teaching |
 |
|
Project Delivery Method:
|
|
Bid
|
 |
|
Project Timeline
|
|
| May 1989 | Planning Start |
| Jan 1990 | Design Start |
| Mar 1992 | Construction Start |
| Feb 1994 | Completion |
|
Last known status: Completed
|
|
 |
| Construction Cost: |
|
$24,756,049 |
| Cost Per Sq. Ft: |
|
$185 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Education
Education: Administration
Education: Classroom
Education: Faculty Office
Engineering
Laboratory: Research
Laboratory: Teaching
|
| Total GSF: |
|
133,790 |
| Total NSF: |
|
74,005 |
| Efficiency: |
|
55% |
 |
|
Building Population:
|
|
250
|
|
Building Services:
|
|
Domestic and industrial hot and cold water, process cooling, Di, compressed air, natural gas, vacuum, emergency power, telephone/data
|
|
Special Equip:
|
|
Class 100, 1000 and 10,000 cleanrooms
|
|
Office Size:
|
|
132 NSF
|
|
Power Req:
|
|
Lighting 290 KVA; lab equipment 800 KVA; mechanical power 775 KVA
|
|
HVAC Req:
|
|
Laboratory: 2.5 cfm/nsf, cleanroom: 4.5 cfm/nsf, Offices, VAV recirculating system: 6 air changes/hr
|
|
Structure/Foundation:
|
|
Exposed architectural concrete and steel frame with exterior stud/tile walls or cement plaster finish
|
 |
|
Lab Module:
|
|
11' x 30'
|
|
Casework Mat'l:
|
|
C-frame base cabinets in cleanroom, standard floor-mounted base cabinets
|
|
Fume Hoods:
|
|
Constant volume fume hoods, laminar-flow fume hoods
|
 |
 |
|
Architect
|
|
Zimmer Gunsul Frasca Architects LLP
|
 |
|
Builder
|
|
McCarthy Building Companies Inc.
|
 |
 |
 |
 |
 |
 |
 |
|
Supplier - Fume Hoods
|
|
NUAIRE Inc.
|
 |
 |
 |
| Profile Created 02/01/1994 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|
Circulate to:[ ]
[ ]
[ ]
Exterior A Photo © Timothy Hursley, courtesy of Zimmer Gunsul Frasca Partnership
Exterior B
Floorplan Notes:
|