 Center for Graduate Education and Research in Cardiovascular Science

A five-story atrium connects the 127,000-sf Center to the existing Medical Services Building. The atrium provides exterior views of the campus through floor-to-ceiling glass, drawing together scientist, faculty and student interaction and communication for collaborative research.

The Center laboratory blocks are highly adaptable and generic to facilitate future change in space requirements and advancements in technology. Adaptability in the lab block is reinforced by modular architectural, structural, mechanical and electrical systems. Support spaces are enclosed between open labs with stairs located at either end of the lab blocks.

Precast panels have a split-faced limestone finish with a sandblasted texture and color contrasting the smooth dark brown brick of the Medical Sciences Building.




Project Information
Building Owner: University of Cincinnati
Owner Contact: Ron Kull, AIA, Assistant VP/University Architect
Building Location: Cincinnati, OH UNITED STATES
Project Type: New Construction
Principal Building Function: Research Laboratories, Offices and Conference Rooms
Project Delivery Method: Individual Bid Packages
Project Timeline
Jun 1990Planning Start
Jun 1990Design Start
Jun 1993Construction Start
Dec 1995Completion
Last known status: Completed
Construction Cost: $19,000,000
Cost Per Sq. Ft: $150
About These Cost Figures
Building Information
Project Includes: Conference Room
Education: Classroom
Education: Lecture Or Seminar Hall
Laboratory: Biomedical Research
Laboratory: Research
Laboratory: Wet
Office: Researcher
Vivarium
Total GSF: 127,000
Total NSF: 68,000
Efficiency: 54%
Building Population: 288
People Density: 440 gsf/person
Building Services: Hot and cold water, R.O., gas, air
Office Size: 110 NSF
Power Req: 1.5 watts/sf
HVAC Req: 1.72 cfm/sf
Structure/Foundation: Structural concrete frame
Laboratory Parameters
Lab Module: 10'6
Casework Mat'l: C-frame metal supports with wood/plastic laminate, epoxy tops
Project Team
Architect BHDP Architecture
Builder C.V. Maescher & Co.
Consultant - Electrical H.A. Williams Associates, Inc.
Consultant - Mechanical H.A. Williams Associates, Inc.
Consultant - Structural THP Limited
Supplier - Building Automation Controls Phoenix Controls Corporation
Supplier - Casework Fisher Hamilton
Supplier - Fume Hoods Fisher Hamilton
Supplier - HVAC Air Enterprise, Inc.
Profile Created 12/01/1995
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Floorplan

 
Fig. 2

Exterior

 