The Medical Research Building and Medical School Entrance at the University of Rochester enhances the School of Medicine's position as a major research and teaching institution.
The project site acts as the gateway to the entire medical center campus, including the affiliated Strong Memorial Hospital. A central spine connecting the medical school and hospital link to the new building entrance.
The 250,000-sf facility provides space for grant-funded research and investigator offices, while developing a flexible site and building plan to allow for future growth and change.
| Building Owner: |
 |
University of Rochester |
 |
|
Owner Contact:
|
|
Jack Dempsey
|
 |
|
Building Location:
|
|
Rochester, NY UNITED STATES
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Biomedical Research Facility |
 |
|
Project Delivery Method:
|
|
Construction Management
|
 |
|
Project Timeline
|
|
| Dec 1996 | Planning Start |
| Dec 1996 | Design Start |
| Jun 1997 | Construction Start |
| Oct 1999 | Target Completion |
|
Last known status: Construction
|
|
 |
| Construction Cost: |
|
$60,000,000 |
| Cost Per Sq. Ft: |
|
$207 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Education
Education: Classroom
Laboratory: Biomedical Research
Laboratory: Research
Office: Researcher
Research
Vivarium
|
| Total GSF: |
|
145,000 |
| Total NSF: |
|
230,000 |
| Efficiency: |
|
63% |
 |
|
Building Services:
|
|
C02, N2, 02, compressed air, vacuum
|
|
Office Size:
|
|
120 NSF
|
|
Structure/Foundation:
|
|
Braced steel frame with driven pile and concrete spread footings.
|
 |
|
Lab Module:
|
|
10'4" x 30'6"
|
|
Casework Mat'l:
|
|
Wood with epoxy resin countertop and sink
|
|
Fume Hoods:
|
|
4', 6'
|
|
Biosafety Cabinets:
|
|
Level II cabinets with provisions for future Level III
|
 |
 |
|
Architect
|
|
Perkins+Will
|
 |
 |
 |
|
Consultant - Laboratory Planner
|
|
GPR Planners Collaborative, Inc.
|
 |
|
Consultant - MEP Engineer
|
|
BR+A/Bard,Rao + Athanas Consulting Engineers Inc.
|
 |
 |
 |
| Profile Created 10/01/1999 |
| Last Updated 05/20/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|
Circulate to:[ ]
[ ]
[ ]
Exterior Rendering courtesy of Perkins & Will, Inc.
Floorplan Notes:
|