Arthur Kornberg Biomedical Research Building

Occupancy: 1999
Published October 1999

The Medical Research Building and Medical School Entrance at the University of Rochester enhances the School of Medicine's position as a major research and teaching institution.

The project site acts as the gateway to the entire medical center campus, including the affiliated Strong Memorial Hospital. A central spine connecting the medical school and hospital link to the new building entrance.

The 250,000-sf facility provides space for grant-funded research and investigator offices, while developing a flexible site and building plan to allow for future growth and change.

Project Information
Building Owner: University of Rochester
Owner Contact: Jack Dempsey
Building Location: Rochester, NY UNITED STATES
Project Type: New Construction
Principal Building Function: Biomedical Research Facility
Project Delivery Method: Construction Management
Project Timeline
Dec 1996Planning Start
Dec 1996Design Start
Jun 1997Construction Start
Oct 1999Target Completion
Last known status: Construction
Construction Cost: $60,000,000
Cost Per Sq. Ft: $207
About These Cost Figures
Building Information
Project Includes: Education
Education: Classroom
Laboratory: Biomedical Research
Laboratory: Research
Office: Researcher
Research
Vivarium
Total GSF: 145,000
Total NSF: 230,000
Efficiency: 63%
Building Services: C02, N2, 02, compressed air, vacuum
Office Size: 120 NSF
Structure/Foundation: Braced steel frame with driven pile and concrete spread footings.
Laboratory Parameters
Lab Module: 10'4" x 30'6"
Casework Mat'l: Wood with epoxy resin countertop and sink
Fume Hoods: 4', 6'
Biosafety Cabinets: Level II cabinets with provisions for future Level III
Project Team
Architect Perkins+Will
Consultant - Laboratory Planner GPR Planners Collaborative, Inc.
Consultant - MEP Engineer BR+A/Bard,Rao + Athanas Consulting Engineers Inc.
Profile Created 10/01/1999
Last Updated 05/20/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
Circulate to:

[ ]

[ ]

[ ]

Exterior

Rendering courtesy of Perkins & Will, Inc.




Floorplan

Notes:














Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894