In this new facility, research space is significantly increased for faculty-student collaboration; and teaching space is expanded and improved to accommodate the greater emphasis on discovery-based learning in the sciences. Connections are created between departments to facilitate and encourage the increasing interactions between the disciplines, and a safer laboratory environment is provided for faculty and students. The new center includes 80,209 sf of renovations and 150,000 sf of new construction.
The center has been designed to:
- Provide first-rate facilities to meet the needs of the laboratory-based sciences at Oberlin for the next 30 years
- Permit intellectual flexibility and growth within and between the science disciplines
- Strengthen the integration of science education with the other liberal arts, and with institutional life at Oberlin
- Create functional and symbolic connections to the Oberlin campus community
- Make maximum use of existing facilities and recent renovations
| Project Information | ||||||||||||
| Building Owner: | Oberlin College | |||||||||||
| Owner Contact: | David A. Love, Associate VP Research & Development | |||||||||||
| Building Location: | Oberlin, OH UNITED STATES | |||||||||||
| Project Type: | New Construction | |||||||||||
| Principal Building Function: | Academic, science center | |||||||||||
| Project Delivery Method: | Design/Build | |||||||||||
| Project Timeline |
|
|||||||||||
| Construction Cost: | $39,300,000 | |||||||||||
| Cost Per Sq. Ft: | $171 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Biology Chemistry Education Education: Lecture Or Seminar Hall Education: Physics Laboratory Library Research |
|||||||||||
| Total GSF: | 228,052 | |||||||||||
| Total NSF: | 121,478 | |||||||||||
| Efficiency: | 53% | |||||||||||
| Building Services: | R0/DI water, processing cooling loop, vacuum | |||||||||||
| Special Equip: | Process cooling loop, greenhouse, animal facility | |||||||||||
| Office Size: | 150 NSF | |||||||||||
| Power Req: | 15 w/nsf | |||||||||||
| HVAC Req: | 1.9 cfm/nsf | |||||||||||
| Structure/Foundation: | Concrete frame with flat slab, spread footings | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 11' x 24' | |||||||||||
| Casework Mat'l: | Wood (red oak) casework with epoxy resin countertops | |||||||||||
| Fume Hoods: | 15 @ 7'; 31 @ 6'; 40 @ 5' | |||||||||||
| Biosafety Cabinets: | 10 | |||||||||||
| Project Team | ||||||||||||
| Architect | Payette | |||||||||||
| Builder | Mosser Construction Co. | |||||||||||
| Consultant - Accoustical | Rowan Williams Davies & Irwin, Inc. (RWDI) | |||||||||||
| Consultant - Audio Visual | Bayly Technology Consulting Inc. | |||||||||||
| Consultant - Civil Engineer | CT Consultants Inc. | |||||||||||
| Consultant - Cost Analysis | Vermeulens Cost Consultants | |||||||||||
| Consultant - Lighting | Warfel Schrager | |||||||||||
| Consultant - MEP Engineer | BR+A/Bard,Rao + Athanas Consulting Engineers Inc. | |||||||||||
| Consultant - Structural Engineer | Barber & Hoffman Inc. | |||||||||||
| Pre-construction Management | Turner Construction | |||||||||||
| Supplier - Building Automation Controls | Siemens Building Technologies | |||||||||||
| Supplier - Fume Hood Controls | Phoenix Controls Corporation | |||||||||||
| Supplier - HVAC | Haakon Industries | |||||||||||
| Profile Created 08/01/2002 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||