The laboratory portion of the building is constructed of reinforced concrete while the atrium is constructed of structural steel with steel beams, girders, and columns supporting a steel deck. Office and support space includes administrative offices, open office, conference rooms, computer and electrical shops, and building support. Graduate student office space associated with the laboratories/cleanroom space are located as close to their respective laboratories as possible.
Dedicated imaging rooms on the first floor house scanning electron microscopy (SEM), transmission electron microscopy (TEM), and scanning transmission electron microscopy (STEM). The second and third floors house mainly laboratory and office space for faculty and graduate students. The main electrical room is in the basement.
The building design provides flexibility to keep pace with the rapid changes in the nature of research and instruction, grant funding cycles, and the appointment of new researchers. It provides the ability to readily convert and renovate space, with a minimum of disruption. As changes in use are called for by new researchers, research direction, or organization; workstations can be relocated, doors moved, and rooms expanded into larger rooms or contracted into several smaller rooms without requiring reconstruction of structural or building services.
Although faculty members might have access to desks within the student are when necessary, Duffield Hall does not include true faculty office space. Instead, Cornell made the strategic decision to leave all faculty offices in their respective departments and buildings around campus.
An important requirement of the design was to create an environment that would foster and promote interaction among all disciplines of the College of Engineering. The site, at the east edge of the Engineering Quadrangle in close proximity to existing laboratories, is ideal for encouraging such interaction. The building provides spaces for casual interaction in or near common facilities such as stairs, alcoves, and conference rooms. The building also provides visibility for researchers to see colleagues moving from laboratory to offices through the atrium space. The atrium includes collaboration spaces with comfortable furniture, ample power, data connections, and white boards for documenting ideas.
| Project Information | ||||||||||||
| Building Owner: | Cornell University | |||||||||||
| Owner Contact: | Peter Karp, AIA, University Architect | |||||||||||
| Building Location: | Ithaca, NY UNITED STATES | |||||||||||
| Project Type: | New Construction | |||||||||||
| Principal Building Function: | Nanotechnology Research Center | |||||||||||
| Project Timeline |
|
|||||||||||
| Project Cost: | $58,500,000 | |||||||||||
| Construction Cost: | $34,200,000 | |||||||||||
| Cost Per Sq. Ft: | $219 | |||||||||||
| About These Cost Figures | ||||||||||||
| Building Information | ||||||||||||
| Project Includes: |
Cleanroom Computers Conference Room Education Education: Administration Education: Faculty Office Engineering Interdisciplinary Research Laboratory Laboratory: Nanotechnology Laboratory: Research Laboratory: Teaching Office Office: Researcher Research |
|||||||||||
| Total GSF: | 150,930 | |||||||||||
| Total NSF: | 57,610 | |||||||||||
| Efficiency: | 46% | |||||||||||
| Building Services: | Exotic gas controls, Class 1000 cleanrooms | |||||||||||
| Office Size: | Cubicle-60; Office-121 NSF | |||||||||||
| Power Req: | Office: 4 w/sf; Labs: 15 w/sf; Cleanrooms: 30 w/sf; All other areas: 2 w/sf | |||||||||||
| HVAC Req: | Recirculation (cleanrooms) 22.5 cfm/nsf; Make-up 4 cfm/nsf; Laboratories 3 cfm/nsf | |||||||||||
| Structure/Foundation: | Cast-in-place concrete and steel moment frame with concrete spread footings and caissons | |||||||||||
| Laboratory Parameters | ||||||||||||
| Lab Module: | 10' 6 | |||||||||||
| Casework Mat'l: | Metal casework tops will be epoxy in heavy chemical areas and around sinks; plastic laminate in lower chemical use areas | |||||||||||
| Fume Hoods: | Nine at 4'; nine at 5'; 19 at 6'; one at 8' | |||||||||||
| Biosafety Cabinets: | Owner Furnished Class II Type A/B3; three @ 4' and 6' @ 8' semi-wet stations | |||||||||||
| Project Team | ||||||||||||
| Architect | Zimmer Gunsul Frasca Architects LLP | |||||||||||
| Builder | McCarthy Building Companies Inc. | |||||||||||
| Consultant - Cost Analysis | Davis Langdon Adamson | |||||||||||
| Consultant - Fire Protection | Rolf Jensen & Associates | |||||||||||
| Consultant - Laboratory Planner | Earl Walls Associates | |||||||||||
| Consultant - Landscape Architect | EDAW, Inc. | |||||||||||
| Consultant - MEP Engineer | BR+A/Bard,Rao + Athanas Consulting Engineers Inc. | |||||||||||
| Consultant - Structural Engineer | LeMessurier Consultants Inc. | |||||||||||
| Consultant - Vibration | Colin Gordon & Associates | |||||||||||
| Profile Created 04/13/2005 | ||||||||||||
| Last Updated 04/04/2006 | ||||||||||||
|
||||||||||||