The new Trexler Pavilion for Theatre and Dance celebrates the artistic integrity and the enormous success of the performing arts at Muhlenberg College.
This facility provides three multiple stages for performance as well as essential technical, administrative, and rehearsal facilities. The flexibility of these studio and theatre spaces creates ample opportunities for students, faculty, and audiences to share in a unique and diverse drama and dance program.
| Building Owner: |
 |
Muhlenberg College |
 |
|
Owner Contact:
|
|
Curtis Dretsch, Dean of Faculty
|
 |
|
Building Location:
|
|
Allentown, PA UNITED STATES
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Performing Arts Center |
 |
|
Project Timeline
|
|
| Jan 1996 | Planning Start |
| Jul 1997 | Design Start |
| May 1998 | Construction Start |
| Jan 2000 | Completion |
|
Last known status: Completed
|
|
 |
| Project Cost: |
|
$9,500,000 |
| Construction Cost: |
|
$8,500,000 |
| Cost Per Sq. Ft: |
|
$193 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Education
Education: Administration
Performing Arts
Theater
|
| Total GSF: |
|
44,000 |
| Total NSF: |
|
29,000 |
| Efficiency: |
|
66% |
 |
|
Office Size:
|
|
9' x 15' NSF
|
|
Structure/Foundation:
|
|
Steel frame with concrete spread footings
|
 |
 |
 |
 |
 |
 |
| Profile Created 12/12/2001 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|