The challenge was in converting the 20-year-old, 62,000-sf facility constructed to suit the specialized needs of the petroleum industry into an updated general chemistry laboratory. The new facility accommodates six research laboratory groups encompassing a wide variety of industrial, chemical, and technical service operations. Each lab group utilizes a variety of potentially hazardous chemicals and requires specialized utilities including hydrogen, helium, nitrogen, de-ionized water, natural gas, steam, compressed air, and vacuum.
The retrofit required adding fume hoods, modifying bench-top services, modifying HVAC, mechanical, and electrical systems, and upgrading architectural details.
The facility design includes an administrative plan for controlling the types and quantities of the chemicals in each lab, involving designated control areas for chemical storage, use, and disposal. The plan coordinates Solutia's practices and protocols, keeping them consistent with local, state, and federal codes.
| Project Information | ||||||||||
| Building Owner: | Solutia Inc. | |||||||||
| Owner Contact: | Kent Vesvick, Technical Team Leader; Dave Baumgartner, Project Manager | |||||||||
| Building Location: | Webster Groves, MO UNITED STATES | |||||||||
| Project Type: | Renovation | |||||||||
| Principal Building Function: | R&D | |||||||||
| Project Delivery Method: | Design/Build | |||||||||
| Project Timeline |
|
|||||||||
| Project Cost: | $6,000,000 | |||||||||
| Construction Cost: | $4,700,000 | |||||||||
| Cost Per Sq. Ft: | $77 | |||||||||
| About These Cost Figures | ||||||||||
| Building Information | ||||||||||
| Project Includes: |
Laboratory: Chemistry R&D |
|||||||||
| Total GSF: | 62,000 | |||||||||
| Total NSF: | 38,400 | |||||||||
| Efficiency: | 62% | |||||||||
| Building Population: | 100 | |||||||||
| People Density: | 620 gsf/person | |||||||||
| Building Services: | DI, N2, compressed air, gas, H, steam, vacuum, CW | |||||||||
| Special Equip: | pH pretreatment facility, discharged water pH is automatically monitored and treated if necessary | |||||||||
| Office Size: | 10' 6" x 7' 6" NSF | |||||||||
| Structure/Foundation: | Concrete foundations, beam, and slab | |||||||||
| Laboratory Parameters | ||||||||||
| Lab Module: | 10' 6" x 23' 6" | |||||||||
| Casework Mat'l: | Acid-resistant countertops and casework | |||||||||
| Fume Hoods: | 96 fume hoods; 79 6' wide bench tops; 17 6' x 7' walk-ins | |||||||||
| Project Team | ||||||||||
| Architect | Flad Architects | |||||||||
| Builder | McCarthy Building Companies Inc. | |||||||||
| Consultant - Electrical | Clark, Richardson & Biskup Consulting Engineers, Inc. | |||||||||
| Consultant - Laboratory Planner | Health, Education + Research Associates Inc. | |||||||||
| Consultant - Mechanical | Clark, Richardson & Biskup Consulting Engineers, Inc. | |||||||||
| Programming | Health, Education + Research Associates Inc. | |||||||||
| Programming | McCarthy Building Companies Inc. | |||||||||
| Supplier - Casework | Fisher Hamilton | |||||||||
| Supplier - Fume Hoods | Fisher Hamilton | |||||||||
| Profile Created 03/01/2000 | ||||||||||
| Last Updated 04/04/2006 | ||||||||||
|
||||||||||
Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Lab Bench

Printer Friendly Version
Send to a Friend
Complete Story