When Monsanto Corporation spun off its core chemical business in late 1997 as Solutia Inc., the new entity needed to find a separate location for its St. Louis research facilities. The solution for Solutia came with a $6-million retrofit of a petro-chemical plant in nearby Webster Groves, Mo. Solutia has relocated a majority of it's St. Louis R&D laboratory equipment and personnel to the upgraded facility.
The challenge was in converting the 20-year-old, 62,000-sf facility constructed to suit the specialized needs of the petroleum industry into an updated general chemistry laboratory. The new facility accommodates six research laboratory groups encompassing a wide variety of industrial, chemical, and technical service operations. Each lab group utilizes a variety of potentially hazardous chemicals and requires specialized utilities including hydrogen, helium, nitrogen, de-ionized water, natural gas, steam, compressed air, and vacuum.
The retrofit required adding fume hoods, modifying bench-top services, modifying HVAC, mechanical, and electrical systems, and upgrading architectural details.
The facility design includes an administrative plan for controlling the types and quantities of the chemicals in each lab, involving designated control areas for chemical storage, use, and disposal. The plan coordinates Solutia's practices and protocols, keeping them consistent with local, state, and federal codes.
| Building Owner: |
 |
Solutia Inc. |
 |
|
Owner Contact:
|
|
Kent Vesvick, Technical Team Leader; Dave Baumgartner, Project Manager
|
 |
|
Building Location:
|
|
Webster Groves, MO UNITED STATES
|
 |
|
Project Type:
|
|
Renovation
|
 |
|
Principal Building Function:
|
|
R&D |
 |
|
Project Delivery Method:
|
|
Design/Build
|
 |
|
Project Timeline
|
|
| Feb 1998 | Planning Start |
| Aug 1998 | Design Start |
| Dec 1998 | Construction Start |
| May 1999 | Target Completion |
|
 |
| Project Cost: |
|
$6,000,000 |
| Construction Cost: |
|
$4,700,000 |
| Cost Per Sq. Ft: |
|
$77 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Laboratory: Chemistry
R&D
|
| Total GSF: |
|
62,000 |
| Total NSF: |
|
38,400 |
| Efficiency: |
|
62% |
 |
|
Building Population:
|
|
100
|
|
People Density:
|
|
620 gsf/person
|
|
Building Services:
|
|
DI, N2, compressed air, gas, H, steam, vacuum, CW
|
|
Special Equip:
|
|
pH pretreatment facility, discharged water pH is automatically monitored and treated if necessary
|
|
Office Size:
|
|
10' 6" x 7' 6" NSF
|
|
Structure/Foundation:
|
|
Concrete foundations, beam, and slab
|
 |
|
Lab Module:
|
|
10' 6" x 23' 6"
|
|
Casework Mat'l:
|
|
Acid-resistant countertops and casework
|
|
Fume Hoods:
|
|
96 fume hoods; 79 6' wide bench tops; 17 6' x 7' walk-ins
|
 |
 |
|
Architect
|
|
Flad Architects
|
 |
|
Builder
|
|
McCarthy Building Companies Inc.
|
 |
 |
 |
 |
 |
|
Programming
|
|
McCarthy Building Companies Inc.
|
 |
|
Supplier - Casework
|
|
Fisher Hamilton
|
 |
|
Supplier - Fume Hoods
|
|
Fisher Hamilton
|
 |
 |
 |
| Profile Created 03/01/2000 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|