 Sprague Hall Biotechnology Lab

The building's massing articulates the spatial and programmatic components of the project. Four cast-in-place concrete shear walls form the vessel that contains the lab program. Concrete beams bear on interior columns, and support joists and slab; the interstitial space provides flexible room for lab service distribution above the ceiling. The laboratory bays, organized for maximum flexibility, fit seamlessly within the structural modules.

As the primary functional element of the project, this three-story volume is simply expressed as a smooth concrete monolith, punctuated by openings at the end of each aisle. Throughout the lab block, these windows extend from near-floor to ceiling, flooding the work area with daylight. On the second and third levels, the windows are deeply recessed, revealing the depth and stability of the concrete wall. Outside, the building engages pedestrians at eye level, offering a base that also functions as seating.




Project Information
Building Owner: University of California, Irvine
Owner Contact: Rebekah Gladson, AIA, Assistant Vice Chancellor
Building Location: Irvine, CA UNITED STATES
Project Type: New Construction
Principal Building Function: Biomedical Research
Project Timeline
Jun 1999Planning Start
Jun 1999Design Start
May 2000Construction Start
Nov 2001Completion
Last known status: Completed
Project Cost: $19,000,000
Construction Cost: $17,500,000
Cost Per Sq. Ft: $280
About These Cost Figures
Building Information
Project Includes: Education
Education: Faculty Office
Laboratory
Laboratory: Biomedical Research
Research
Total GSF: 62,393
Total NSF: 43,173
Efficiency: 69%
Building Services: DI, compressed air, vacuum, steam, cold rooms, warm room, BSL3 suite, dark room
Office Size: 120 sf NSF
HVAC Req: 2.76 cfm/nsf
Structure/Foundation: Cast-in-place concrete shear wall with spread footing
Laboratory Parameters
Lab Module: 11' x 11'
Casework Mat'l: Maple veneer with solid epoxy countertops
Fume Hoods: 18 @ 6'
Biosafety Cabinets: Class 2
Project Team
Architect Eshrick Homsey Dodge & Davis
Architect - Executive Leo A Daly
Builder Nielsen-Dillingham Builders
Consultant - Accoustical Schaffer Acoustics Inc.
Consultant - Civil Engineer Boyle Engineering
Consultant - Electrical Engineer Konsortum 1
Consultant - Landscape Architect Glenn Matsui Associates
Consultant - MEP Engineer Bechard Long & Associates Inc
Consultant - Structural Engineer Leo A Daly
Profile Created 03/31/2001
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894