Health Professions Building
Published March 2005
The 172,000-sf, $50 million Health Professions Building at Central Michigan University is considered one of the most technologically advanced teaching facilities in the country. The building is designed to serve as an experimental lab to accelerate learning and educational solutions, an incubator for new ideas focused on developing authentic student-centered education, a portal for creating customized educational experiences, and a test bed for evaluating and analyzing the effectiveness of learning strategies and space designs.
Technology includes wireless Internet access throughout the facility, video cameras in 70 locations, more than 50 multi-image projection screens or video walls in classrooms, portable plasma screens, a virtual reality simulation lab, a master control room, six wet labs, a cold room, five different seating options for classrooms, a therapeutic pool, a darkroom, a radioisotope room, 13 fully mediated labs, and portable laptop units that allow every classroom to function as a computer lab. The plasma screens can be moved throughout the interior and exterior of the building for use in clinical areas, the courtyards, atrium, or conference rooms. Images can also be sent directly to the master control room and then be routed to anywhere in the building, on campus, or around the world. Researchers can send images from the microscopes directly to colleagues in France. The technology can also be used to allow students in a classroom to observe clinical work as it is being performed on a patient.
The building also contains shared labs, 24/7 access for graduate students through an electronic security system, classrooms/computer labs, and flexible classroom setups that can be adapted to suit a particular learning environment. A wide range of health programs are housed in the facility including neuroscience, clinical psychology, speech language pathology, audiology, physical therapy, health fitness, health administration, public health, health education, physician assistant, athletic training, physical education, and sports administration. Special features include a central atrium where educational and social events can be held, courtyards, a waterfall and fountain, an open atmosphere with plenty of windows, movable furniture, and numerous places for students to gather.
The technology has changed the teaching paradigm in the Health Professions Building. Faculty members moved from being dispensers of knowledge to architects and designers of the learning experience, introducing strategies and practices that empower student learning. Hand-held transmitters are also available for use by the students to provide immediate feedback to teachers on how well they understand a subject. The teacher asks the students if they comprehend a certain point of the lecture and they respond by pressing the appropriate button on the transmitter, providing real-time feedback to the faculty member.
| Building Owner: |
 |
Central Michigan University |
 |
|
Owner Contact:
|
|
Linda Seestedt-Stanford, Assistant Dean
|
 |
|
Building Location:
|
|
Mount Pleasant, Michigan UNITED STATES
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Teaching, Research, Clinic |
 |
|
Project Delivery Method:
|
|
General Contractor
|
 |
|
Project Timeline
|
|
| Nov 1999 | Planning Start |
| Feb 2000 | Design Start |
| Sep 2000 | Construction Start |
| Aug 2003 | Completion |
|
Last known status: Completed
|
|
 |
| Project Cost: |
|
$50,000,000 |
| Construction Cost: |
|
$30,500,000 |
| Cost Per Sq. Ft: |
|
$177 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Atrium
Auditorium
Biology
Cafeteria
Computers
Conference Room
Dining
Education
Education: Biology
Education: Classroom
Education: Computer Lab
Education: Faculty Office
Education: Lecture Or Seminar Hall
Education: Multimedia
Education: Student Center
Fitness Center
Healthcare
Healthcare: Ambulatory Outpatient Clinic
Healthcare: Medical School
Interdisciplinary Research
Laboratory
Laboratory: Teaching
Library
Office
Research
Video Conferenceing Center
Vivarium
|
| Total GSF: |
|
172,000 |
| Total NSF: |
|
103,500 |
| Efficiency: |
|
60% |
 |
|
Building Population:
|
|
1250
|
|
People Density:
|
|
138 gsf/person
|
|
Building Services:
|
|
Water (hot and cold)
Soft Water (for Vivarium equipment)
Natural Gas (for labs and pool heater)
Storm
Sanitary
Campus Steam
Campus Chilled Water
|
|
Special Equip:
|
|
Therapeutic pool, radioisotopes, wet labs, cold room, dark room, 13 mediated classrooms, vivarium
|
|
Office Size:
|
|
100 NSF
|
|
Power Req:
|
|
Lighting: 2 w/sf
Power: 7 w/sf
Mechanical: 8 w/sf
Equipment: 5 w/sf
TOTAL: 22 w/sf
|
|
HVAC Req:
|
|
193,000 total cfm, variable air volume throughout
600 tons cooling capacity (from campus chilled water system)
9200 MBH heating capacity (from campus steam system, converted to hot water)
2500 MBH domestic water heating capacity (from campus steam system)
60 ton back-up chiller and redundant fans utilized for the Vivarium systems
|
|
Structure/Foundation:
|
|
Structural steel frame with composite floor slabs
|
 |
 |
|
Builder
|
|
JM Olson
|
 |
|
Commissioning Agent
|
|
LL Catey Engineering
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Profile Created 03/09/2005 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|
Circulate to:[ ]
[ ]
[ ]
Computer Labs Classrooms in the new building, which has been recognized by the Chronicle of Higher Education as one of the most technologically advanced teaching facilities in the country, offer five different seating options. Portable laptop units allow classrooms to function as computer labs. (Photo courtesy of SmithGroup and Peggy Brisbane, Central Michigan University.)
Atrium A special feature of the new building is the central atrium which serves as a gathering spot and excellent location for educational and social events. Features such as this promote collaboration and result in high utilization of the facility. (Photo courtesy of SmithGroup and Peggy Brisbane, Central Michigan University.)
Equipment Technology in the HPB includes wireless Internet access throughout the facility, video cameras in 70 locations, and more than 50 multi-image projection screens or video walls in classrooms. (Photo courtesy of SmithGroup and Peggy Brisbane, Central Michigan University.) Notes:
|