 James H. Clark Center for Biomedical Engineering and Studies

Completed in September 2003, the 245,000-gsf building has three wings, three floors, a partial basement, and 146,000 nsf of laboratory space. Designing around the initiatives of biocomputation, biophysics, regenerative medicine, genomics and proteomics, chemical biology, and biodesign forced the team to develop generic lab solutions rather than specific lab plans. The $146.6 million project has a comfortable environment and flexible labs that are expected to accommodate between 600 and 700 people when the building is fully occupied.

Innovative flexible, 10'-high work spaces include accessible utilities, mobile casework, and adaptable infrastructure. Sealed epoxy floors allow work areas to be utilized as wet or dry labs. A Unistrut ceiling and racks provide drop-down access to standard utility services, such as gas, air, vacuum, electricity, and water. The Unistrut drops are mobile and can be moved easily and inexpensively by unscrewing a few bolts, so that lab spaces can be converted to wet or dry areas to accommodate each researcher’s work. Sinks are the only items that are not mobile.

Each stage of the final laboratory and office design was evaluated using a full-size mock up of actual materials and systems. The result is a layout that meets the unique user needs and desires of a modular, flexible organization of laboratories and offices.

Interaction is encouraged with regionally shared facilities, a café, seminar rooms, and an auditorium. Fifteen percent of the building is dedicated to public functions such as conference rooms and classrooms, while nine percent consists of facilities that are shared by people within the Center. The shared facilities include small animal imaging, biocomputation collaboratories, central glasswash, and media prep.

Collaboration is unavoidable by way of the building’s unique design which features open labs, plenty of social spaces, and shared instrumentation. There are no interior corridors in the building and the inner courtyards are completely glass. Researchers on the second floor can look across the courtyard into other laboratories. Bridges connect the wings of the building and a raised platform in the center of the courtyard can be used as a stage for lectures or concerts.




Project Information
Building Owner: Stanford University
Building Location: Palo Alto, California UNITED STATES
Project Type: New Construction
Principal Building Function: Interdisciplinary research and laboratories
Project Delivery Method: Fast Track
Project Timeline
Jun 2001Construction Start
Sep 2003Completion
Last known status: Completed
Project Cost: $146,600,000
Construction Cost: $100,300,000
About These Cost Figures
Building Information
Project Includes: Auditorium
Biochemistry
Biotechnology
Chemistry
Education
Education: Biomedical
Education: Chemistry
Education: Classroom
Education: Lecture Or Seminar Hall
Genomics
Interdisciplinary Research
Laboratory
Laboratory: Biomedical Research
Laboratory: Chemistry
Laboratory: Dry And Wet
Laboratory: Research
Office: Researcher
Research
Total GSF: 245,200
Total NSF: 146,073
Efficiency: 60%
Building Population: 40
Project Team
Architect MBT Architecture
Architect - Design Foster & Partners
Builder Hathaway Dinwiddle Construction Company
Consultant - Accoustical Charles M. Salter
Consultant - Cost Analysis Davis Langdon Adamson
Consultant - Plumbing Therma, Inc.
Consultant - Vibration Wilson Ihrig & Associates
Engineer - Civil Brian Kangas Faulk
Engineer - Electrical Cupertino Electric
Engineer - Mechanical Alfa Tech Consulting Engineers
Engineer - Structural Middlebrook & Louie
Landscape Architect Peter Walker and Partners
Supplier - Accoustical Ceiling Tile Armstrong World Industries
Supplier - Carpet Pacificrest Mills
Supplier - Casework ISEC Inc.
Supplier - Casework Fisher Hamilton
Supplier - Curtainwall Pohl Inc.
Supplier - Elevators Schindler Elevator Corporation
Supplier - Exterior Skin Marlite Surface Systems
Supplier - Fire Protection Northstar Fire Protection
Supplier - Laboratory Fixtures Broen Lab Inc.
Supplier - Laboratory Fixtures WaterSaver Faucet Co.
Profile Created 08/01/2007
Last Updated 09/03/2007
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Courtyard

 
Fig. 2

Classroom

 
Fig. 3

Flexible Offices

 
Fig. 4

Open Labs

 
Fig. 5

Lab Interior

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!