 Building R14
 

As with many of Abbott's other laboratory buildings, the lab spaces are arranged along both sides of a central utility corridor running the length of the building. This space allows the utilities to travel from their sources in the lower level mechanical rooms to the lab benches. In other buildings, this corridor is normally locked and accessible only to maintenance personnel. In R14, this utility corridor is open and directly accessible to the labs. Designated spaces are provided for storage cabinets, ice machines, portable equipment, and other items that can be shared with neighboring labs, saving valuable lab floor space.




Project Information
Building Owner: Abbott Laboratories
Building Location: Chicago, IL UNITED STATES
Project Type: New Construction
Principal Building Function: Research & development laboratories: 50 percent Chemistry/ 50 percent Analytical
Project Delivery Method: Individual Bid Packages
Project Timeline
Aug 1996Planning Start
Aug 1996Design Start
Apr 1997Construction Start
Jul 1998Target Completion
Project Cost: $34,500,000
Construction Cost: $27,000,000
Cost Per Sq. Ft: $304
About These Cost Figures
Building Information
Project Includes: Laboratory: R&D
Total GSF: 113,400
Total NSF: 53,600
Efficiency: 47%
Building Population: 140
People Density: 383 gsf/person
Building Services: HW, CW, chemical waste, compressed air, distilled water, nitrogen, vacuum, steam
Office Size: 10'x10'/8' x 8' NSF
Power Req: Lighting: 0.75-1.25 w/nsf Equipment: 5-10 w/nsf
HVAC Req: 3.53 cfm/Lab nsf 1.6 cfm/gsf
Structure/Foundation: Steel with metal deck
Laboratory Parameters
Lab Module:
Project Team
Architect McClier
Supplier - Casework Kewaunee Scientific Corporation
Supplier - Fume hoods Kewaunee Scientific Corporation
Profile Created 10/01/1999
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Exterior

Exterior View

 
Fig. 2

Laboratory

Occupying two floors are 35 analytical labs on the first floor and 35 chemical development labs on the fourth.

 