Search: Advanced
TradelineInc.com
Conferences News Planning Jobs About Store Accounts
 
 Main Library

Thirty wireless stations for laptops and 42 computers are provided throughout the library. This allows both personal laptop computers and university-provided laptop use in the library. Among the other features are two information and integrated teaching and learning areas.

The multimedia room provides the University with statewide transmission capabilities for distribution of electronic book and video. It serves as a hub for coordination of real time and delayed videos, classes, lectures, and meetings.

The Curriculum Resource Center (CRC) provides access to K-12 curriculum and testing material within a classroom environment. It is equipped with a document camera, video projector AMX touch panel instructor's station with a computer, VCR/DVD player, monitor, video camera, printer, and server capable of both network and local access. The room provides seating for 20 children with computer access.




Project Information
Building Owner: National University
Owner Contact: Kevin Casey, Vice President of Administration & Business
Building Location: San Diego, CA UNITED STATES
Project Type: New Construction
Principal Building Function: Academic library
Project Timeline
Jan 1999Planning Start
Mar 1999Design Start
Oct 1999Construction Start
Aug 2000Completion
Last known status: Completed
Project Cost: $11,300,000
Construction Cost: $4,600,000
Cost Per Sq. Ft: $115
About These Cost Figures
Building Information
Project Includes: Computers
Education
Education: Multimedia
Library
Total GSF: 40,000
Total NSF: 31,547
Efficiency: 79%
Building Population: 400
People Density: 100 gsf/person
Special Equip: Automated compact stacks
Planning Module: 30' x 38'
Structure/Foundation: Sog, tilt-up construction with steel atrium
Laboratory Parameters
Lab Module: 10' x 24'
Project Team
Architect Delawie Wilkes Rodrigues Barker
Builder Reno Contracting Inc.
Consultant - Electrical ILA & Zammit Engineering
Consultant - Landscape Architect WimmerYamada & Caughey
Consultant - Lighting ILA & Zammit Engineering
Consultant - Mechanical TKG Consulting Engineering Inc.
Consultant - Plumbing TKG Consulting Engineering Inc.
Consultant - Structural Engineer Hope Engineering Inc
Profile Created 03/31/2001
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Main Library

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!