Search: Advanced
TradelineInc.com
Conferences News Planning Jobs About Store Accounts
 
 Children's Memorial Institute for Education and Research/Biomedical Reserach Lab Building

A 48,300-gsf building addition with 25,200 nsf of laboratory and laboratory support space plus 3,500 nsf of laboratory renovation in the existing building. Research laboratories consist of a new directors lab, three floors of open core labs and support, renovated animal BSL-2 labs, and renovation for expansion of animal holding rooms. Support spaces include an Instrument Farm, Freezer Farm, Electron Microscope Suite, BSL-3 Laboratory Suite, Specialty Animal Holding Room, and Core Lab Tissue Culture Rooms.




Project Information
Building Owner: Children's Memorial Medical Center
Building Location: Chicago, IL AFGHANISTAN
Project Type: New Construction
Principal Building Function: Biomedical research for human and molecular genetics, development systems, biology, immunobiology, neurobiology, cancer biology and chemotherapy
Project Timeline
Jan 1995Completion
Last known status: Completed
Project Cost: $25,000,000
Construction Cost: $16,500,000
Cost Per Sq. Ft: $236
About These Cost Figures
Building Information
Project Includes: Conference Room
Healthcare
Healthcare: Pediatric
Laboratory
Vivarium
Total GSF: 70,000
Total NSF: 42,000
Building Services: Lab, air, lab vacuum, high purity water, biosafety level 2 suite, electron microscopy suite
Project Team
Architect Soloman Cordwell Buenz & Associates
Consultant - Laboratory Design Research Facilities Design (RFD)
Contractor Morse Diesel International
Engineer Environmental Systems Design, Inc.
Profile Created 01/01/1995
Last Updated 04/04/2006
About the Reported Cost Figures
The cost figures reported are supplied by the firms that submitted these projects for publication, which in most cases are the designers or builders. Whereas these sources are intimately familiar with their projects, they may not be fully aware of the owners' finally-realized and recorded costs. In some cases, costs are truly and completely accounted for, and in others they represent a near approximation of the final costs. Costs have not been adjusted for year of construction, nor has any attempt been made to make regional cost adjustments.

Further, costs are not comparable on any kind of detailed standard costing model. Hence, it is possible for the cost of one building to include a steam boiler, while the cost of a comparable building might not include the boiler, if steam is being supplied from an already existing campus grid. Or, in another case, a building might include excess boiler capacity to supply steam to another building. Some submittals include fees or unusual site improvements as part of the construction costs, which others do not.
We welcome your Questions and Comments

Copyright 2008 Tradeline Inc.
All Rights Reserved
ISSN: 1096-4894
Fig. 1

Laboratory

Laboratory

 
Fig. 2

Exterior

Exterior

 

 Related Resources

  Get Updates by Email
Would you like information like this delivered to your email inbox? Subscribe to Tradeline Updates to keep abreast of the latest conference developments, industry news, best practices and more!
Sign Up Now!