Children's Memorial Institute for Education and Research/Biomedical Reserach Lab Building
Published January 1995
A 48,300-gsf building addition with 25,200 nsf of laboratory and laboratory support space plus 3,500 nsf of laboratory renovation in the existing building. Research laboratories consist of a new directors lab, three floors of open core labs and support, renovated animal BSL-2 labs, and renovation for expansion of animal holding rooms. Support spaces include an Instrument Farm, Freezer Farm, Electron Microscope Suite, BSL-3 Laboratory Suite, Specialty Animal Holding Room, and Core Lab Tissue Culture Rooms.
| Building Owner: |
 |
Children's Memorial Medical Center |
 |
|
Building Location:
|
|
Chicago, IL AFGHANISTAN
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Biomedical research for human and molecular genetics, development systems, biology, immunobiology, neurobiology, cancer biology and chemotherapy |
 |
|
Project Timeline
|
|
| Jan 1995 | Completion |
|
Last known status: Completed
|
|
 |
| Project Cost: |
|
$25,000,000 |
| Construction Cost: |
|
$16,500,000 |
| Cost Per Sq. Ft: |
|
$236 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Conference Room
Healthcare
Healthcare: Pediatric
Laboratory
Vivarium
|
| Total GSF: |
|
70,000 |
| Total NSF: |
|
42,000 |
 |
|
Building Services:
|
|
Lab, air, lab vacuum, high purity water, biosafety level 2 suite, electron microscopy suite
|
 |
|
Architect
|
|
Soloman Cordwell Buenz & Associates
|
 |
|
Consultant - Laboratory Design
|
|
Research Facilities Design (RFD)
|
 |
 |
 |
 |
 |
| Profile Created 01/01/1995 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|
Circulate to:[ ]
[ ]
[ ]
Laboratory Laboratory
Exterior Exterior Notes:
|