Hasbro Childrens Hospital
Published January 1994
| Building Owner: |
 |
Rhode Island Hospital |
 |
|
Building Location:
|
|
Providence, RI USA
|
 |
|
Project Type:
|
|
New Construction
|
 |
|
Principal Building Function:
|
|
Pediatric services including emergency/trauma radiology treatment, administration, physical therapy, inpatient/outpatient services, pediatric intensive care, surgery and 177 patient beds |
 |
|
Project Delivery Method:
|
|
Construction Management (CM)
|
 |
|
Project Timeline
|
|
| Jan 1994 | Completion |
|
Last known status: Completed
|
|
 |
| Project Cost: |
|
$50,236,000 |
| Construction Cost: |
|
$33,400,000 |
|
|
About These Cost Figures
|
 |
|
Project Includes:
|
|
Healthcare: Ambulatory Outpatient Clinic
Healthcare: Inpatient Acute Care
Healthcare: Surgery
|
| Total GSF: |
|
187,000 |
 |
|
Building Services:
|
|
Low pressure steam, high pressure steam (100 psi), heating hot water, 475 tons of chilled water, three air handling units w/ overall capacity of 153,000 cfm, 1.1 cfm/gsf and VAV automatic control system. Also automatic temperature control system with comb
|
 |
|
Architect
|
|
Shepley Bulfinch
|
 |
|
Construction Management
|
|
Gilbane Building Company
|
 |
 |
 |
 |
 |
| Profile Created 01/01/1994 |
| Last Updated 04/04/2006 |
 |
 |
The cost figures reported are supplied by the firms that submitted these
projects for publication, which in most cases are the designers or builders.
Whereas these sources are intimately familiar with their projects, they may
not be fully aware of the owners' finally-realized and recorded costs. In some
cases, costs are truly and completely accounted for, and in others they represent
a near approximation of the final costs. Costs have not been adjusted for
year of construction, nor has any attempt been made to make regional cost
adjustments.
Further, costs are not comparable on any kind of detailed standard costing model.
Hence, it is possible for the cost of one building to include a steam boiler, while
the cost of a comparable building might not include the boiler, if steam is being
supplied from an already existing campus grid. Or, in another case, a building might
include excess boiler capacity to supply steam to another building. Some submittals
include fees or unusual site improvements as part of the construction costs, which
others do not.
|
|
|