Washington University The $32-million facility was designed and built as a result of a complete collaboration between the design team and the Department Chair, Frank C.P. Yin, M.D., Ph.D., pre-eminent scholar and research scientist. This is the first facility on the East Campus that allows for the future migration of all the engineering disciplines at Washington University.
| | 9.1.04
 |