Skip to main content

Energy Use Reduction

University of Idaho Constructs Integrated Research and Innovation Center

Published 3/19/2016

The University of Idaho is building the $50 million Integrated Research and Innovation Center (IRIC) on its Moscow campus. Featuring flexible laboratories for interdisciplinary research, the collaborative 70,000-sf project will include a state-of-the art visualization suite, offices, conference rooms, and core labs with shared equipment. Ground was broken on the center in August of 2014, and completion is expected in fall of 2016 with occupancy in early 2017. LEED Gold sustainable design certification will be sought for the project.

Read More

Charles McC. Mathias Laboratory

Published 3/9/2016

A three-story, 69,000-sf addition and 21,000-sf renovation to the Mathias Laboratory at the Smithsonian Environmental Research Center greatly enhance the Institution’s capacity for environmental research in Chesapeake Bay. A two-story atrium connects the old and new sections and creates collaboration space for more than 180 researchers, technicians, and students investigating global climate change, the effects of nutrients/chemicals on the environment, fisheries, biological threats, and wetlands/woodlands protection.

Read More

University of Cambridge Plans Biomedical Research Facility

Published 2/15/2016

The University of Cambridge is planning to build a $125 million biomedical research facility in the United Kingdom. The six-story, 190,000-sf Project Capella will house the Cambridge Stem Cell Institute, the Milner Therapeutics Institute, the Cambridge Institute of Therapeutic Immunology & Infectious Disease, and the Cambridge Centre for Haematopoiesis and Haematological Malignancies. Lean construction methodology will be implemented in the delivery of the facility, which is slated for completion in the second quarter of 2018.

Read More

Indiana University Bloomington Breaks Ground on Graduate Center

Published 2/13/2016

Indiana University Bloomington broke ground in January of 2016 on the $12 million Paul H. O'Neill Graduate Center at the School of Public and Environmental Affairs. Designed by BSA LifeStructures, the three-story, 28,000-sf facility will support graduate programs in public affairs, environmental management, and environmental science. The project will feature technology-rich learning and meeting spaces, three student commons areas, and faculty offices. Completion is expected in early 2017.

Read More

University of Toronto Opens Environmental Science and Chemistry Building

Published 2/8/2016

The University of Toronto opened the $52.7 million Environmental Science and Chemistry Building in January of 2016. Located on the Scarborough campus in Toronto, the 110,000-sf facility was designed by Diamond Schmitt Architects and delivered with design-build construction partner EllisDon. Providing flexible teaching and research space for the study of climate change and environmental science, the five-story collaborative building houses classrooms, laboratories, and academic offices connected by a skylit forum and crossroads.

Read More

VU University Medical Center Builds Imaging Research Facility

Published 2/5/2016

VU University Medical Center will begin construction in March of 2016 on the 172,222-sf VUmc Imaging Center Amsterdam. Providing flexible laboratories for biomedical research, the six-story facility will promote interaction and collaboration by collocating the hospital's radiology and nuclear medicine departments in a single location. The sustainably designed project will be constructed to attain a BREEAM Very Good rating by a joint venture of De Beeldbouwers VOF and Ballast Nedam.

Read More

Legacy Health Opens Headquarters and Central Laboratory

Published 1/30/2016

Legacy Health opened its $27 million headquarters and central laboratory facility in January of 2016 in Portland, Ore. The 62,000-sf building was sustainably designed to provide substantial energy savings and increased operational efficiencies. The project doubles the footprint of Legacy's previous location and will enable the company to expand to meet the growing demand for laboratory services.

Read More

University of Wyoming Opens Enzi STEM Facility

Published 1/25/2016

The University of Wyoming opened the $50 million Michael B. Enzi STEM Facility in Laramie in January of 2016. Designed to promote team-based, interactive learning, the 107,000-sf building features studio-style classrooms and an atrium commons area. The three-story facility provides 32 teaching labs for instruction in chemistry, biology, organic chemistry, physics, mathematics, life sciences, and computer science. The building also houses an atmospheric sciences lab to support collaborative research with the NCAR-Wyoming Supercomputing Center in Cheyenne.

Read More

Bellevue College Opens Health Sciences Building

Published 1/23/2016

Bellevue College opened its $21.8 million Health Sciences Building in December of 2015 in Bellevue, Wash. Designed by LMN Architects and built by Bayley Construction, the 70,500-sf facility provides classrooms and teaching labs for programs in imaging and nursing, as well as academic and administrative offices. The Health Sciences Building features a five-room simulation training lab and two clinical skills labs with a total of 20 hospital beds.

Read More

Continuous Mission Alignment with Facility Design Prevents Operational Failures

Published 1/20/2016

Complex technology, expanding program, and increasingly specialized and segmented roles and responsibilities often create a disconnect in the process of designing and building sophisticated facilities. The result can be a research or diagnostic lab or high-containment animal building that becomes a burden to the owner, whether because it hasn’t been right-sized, is not energy efficient, or operates with sub-par reliability. The solution is to assign someone the task of aligning design decisions with the building’s ultimate scientific mission.

Read More

OncoSec Opens San Diego Headquarters and Research Facility

Published 1/19/2016

OncoSec Medical Incorporated, a company developing DNA-based intratumoral cancer immunotherapies, opened its new headquarters and research facility in San Diego in December of 2015. Consolidating three previous offices, the 34,000-sf project houses over 50 employees and all of OncoSec's discovery research, clinical, and administrative activities under one roof. The facility features approximately 15,000 sf of technology-rich lab space that is strategically arranged to optimize workflow and minimize potential disruptions.

Read More

University of Central Arkansas Builds Conway Corporation Center for Sciences

Published 1/5/2016

The University of Central Arkansas is building the Conway Corporation Center for Sciences in Conway, Ark. Designed by Stuck Associates and WER Architects/Planners, the project includes renovation of the Lewis Science Center and construction of a three-story, 50,000-sf addition at a cost of $17.5 million. Research Facilities Design (RFD) is providing laboratory programming and design services for the facility, which will feature flexible labs and classrooms to support emerging pedagogies.

Read More

Mote Marine Laboratory Plans Research and Education Facility

Published 12/17/2015

Mote Marine Laboratory will begin construction in January of 2016 on a new research and education facility in Sarasota, Fla. Designed by Hall Architects, the building will accommodate the study of ocean and coastal ecosystems and the impact of climate change. The project will provide technology-rich laboratories, environmental rooms, seawater systems, experimental tanks, classrooms, offices, and conference rooms.

Read More

University of Washington Plans Nanoengineering & Sciences Building

Published 11/30/2015

The University of Washington is planning to build the Nanoengineering & Sciences Building in Seattle. Designed by ZGF, the 78,000-sf interdisciplinary facility will provide approximately 43,000 ASF of research space for the departments of bioengineering, mechanical engineering, chemical engineering, and materials sciences.

Read More

Swarthmore College Plans Biology, Engineering, and Psychology Building

Published 11/26/2015

Swarthmore College will begin construction in spring of 2017 on the $120 million Biology, Engineering, and Psychology Building (BEP) in Swarthmore, Pa. The facility will be developed according to the College’s Environmental Sustainability Framework, a standard equivalent to LEED Platinum, with some elements exceeding LEED Platinum criteria. The project will utilize sophisticated energy modeling technologies to optimize post-occupancy performance and will include an extensive geothermal system. Completion is expected in August of 2020.

Read More