Skip to main content

The Packard Foundation Opens Net-Zero Office Building

Published 7/6/2012

The David and Lucile Packard Foundation opened its net-zero office building in late June of 2012. Located in Los Altos, Calif., the 50,000-sf facility is expected to attain LEED Platinum certification with a total of 95 LEED points. The two-story wood and steel structure was designed by EHDD and built by DPR Construction. The facility features advanced building systems, a sophisticated exterior skin, and a rooftop photovoltaic array.