Skip to main content

Toyota Opens Production Engineering and Manufacturing Center

Published 11/15/2017

Toyota opened the $80 million Production Engineering and Manufacturing Center in late October of 2017. Accommodating over 600 engineers and 200 support staff, the 235,000-sf facility offers 3D printing technologies, augmented and virtual reality suites, and the TILT lab, an experimental engineering hub for problem solving and innovation. Designed to attain LEED Platinum sustainable design certification, the center utilizes a geothermal HVAC system, photovoltaic panels, and natural lighting.