Skip to main content

Lord Aeck Sargent

Lord Aeck Sargent

<p>Our in-house laboratory architects and designers have the expertise and experience to provide a comprehensive and integrated continuum of planning, design and construction delivery services for scientific, engineering and educational facilities from the early dream stage to final systems commissioning. We use innovative materials, function-based designs and user-friendly systems. Our clients appreciate our focus on sustainable design and our strict attention to environmental, safety and fiscal requirements. We provide the following services:</p>
<ul>
<li><em>Architectural and Interior Design</em></li>
<li><em>Bio-containment Facility Planning and Design</em></li>
<li><em>Construction Management</em></li>
<li><em>Education Facility Programming</em></li>
<li><em>Facility Conditions Analysis</em></li>
<li><em>Feasibility Studies</em></li>
<li><em>Grant Writing Assistance</em></li>
<li><em>Laboratory Programming and Design</em></li>
<li><em>Master Planning</em></li>
<li><em>Project Management</em></li>
<li><em>Robotics Integration</em></li>
<li><em>Safety Analysis</em></li>
<li><em>Strategic Planning and Programming</em></li>
<li><em>Sustainable, Energy Efficient Design</em></li>
<li><em>Systems and Building Commissioning</em></li>
<li><em>Vivarium Planning and Design</em></li>
</ul>

Contact
Cynthia Radecki, AIA

1201 Peachtree Street
Atlanta, GA 30361-3500
United States

Phone

In the News

Auburn University Builds STEM + Ag Complex

Published 11/3/2023

Auburn University will begin construction in late 2023 on the $200 million STEM + Ag Complex in Auburn, Ala. Housing programs for the College of Science and Mathematics and the College of Agriculture, the 285,000-sf complex will accommodate the departments of mathematics and statistics, biological sciences, geosciences, horticulture, entomology and plant pathology, and crop, soil, and environmental sciences. The three-building development will provide wet and dry research labs, offices for principal investigators, collaboration spaces, and shared lab support areas.

Read More

University of Alabama at Birmingham Breaks Ground on Gorrie Hall of Engineering

Published 8/18/2023

The University of Alabama at Birmingham broke ground in July of 2023 on the $84 million Frances and Miller Gorrie Hall. Housing the School of Engineering, the 116,000-sf facility will enable a progressive pedagogy that blends academic instruction with hands-on learning and industry experience. With a welcoming commons opening onto an outdoor patio, the vibrant structure will provide flexible teaching and research labs, a design and prototyping lab, and a 2,000-sf materials testing lab.

Read More

University of Alabama at Birmingham Opens First Phase of Science and Engineering Complex

Published 8/4/2023

The University of Alabama at Birmingham opened the first phase of the Science and Engineering Complex in August of 2023. The $76 million facility was designed by Goodwyn Mills Cawood as a collaborative nexus for teaching and research in the basic sciences. Collocating undergraduate and graduate programs, the four-story, 145,784-sf building accommodates the departments of biology and physics, as well as providing lab and support space for the department of chemistry.

Read More

University of Tennessee Constructs Agriculture and Natural Resources Building

Published 2/24/2023

The University of Tennessee is constructing the $95 million Agriculture and Natural Resources Building in Knoxville. Designed by Barber McMurry Architects and Lord Aeck Sargent, the 157,000-gsf facility will provide the College of Agricultural Sciences and Natural Resources with both interdisciplinary and specialized lab environments for teaching, research, and public service.

Read More

University of Alabama at Birmingham Builds Science and Engineering Complex

Published 1/13/2022

The University of Alabama at Birmingham is constructing the $76 million Science and Engineering Complex to create a collaborative nexus for teaching and research in the basic sciences. Designed by Goodwyn, Mills and Cawood, the four-story, 138,842-sf facility will house interactive classrooms, team learning rooms, faculty and staff offices, and project-based research labs that allow for student shadowing. Instrumentation suites will be located on an isolation floor to mitigate vibration.

Read More