Warren Woods Ecological Field Station

University of Chicago
Published 1-21-2015
  • Laboratory

    Photo by Trent Bell Photography

  • Stainless Steel Screen Panels

    Photo by Trent Bell Photography

  • Seminar and Kitchen

    Photo by Trent Bell Photography

  • Therm Model, Slab Edge of Foundation

    Courtesy of GO Logic, LLC

  • Main Level Floor Plan

    Courtesy of GO Logic, LLC

The University of Chicago’s two-story, 2,450-sf Warren Woods Ecological Field Station is the first Passive House-certified laboratory in North America and only the fifth in the world. “Passive House” standards achieve minimal energy usage for heating and cooling, despite the presence of a minus-80-degree-Celsius freezer, plant growth chambers, an incubator, and tools for DNA extraction, all of which generate a lot of heat, coupled with a humid environment and a high level of occupancy by researchers.

The field station, located on 42 acres of land near Warren Woods State Park in southwestern Michigan, includes a main building with a fully equipped 450-sf wet laboratory, 35-seat seminar space for educational programs, kitchen, and a screened porch, plus three detached sleeping cabins and a bath house. The facility is owned and operated by the Department of Ecology and Evolution at the University of Chicago.

The area features lowland hardwood forest, climax beech-maple forest, remnant wet prairie, and part of the Galien River.

Research by faculty, postdoctoral students, and graduate students focuses on the origin and maintenance of biodiversity in butterflies, evolutionary trajectories, genetic basis of plant-pathogen interactions, origin of new genes, population dynamics of defoliating insects, and ecological interactions between local species, as well as botanical experiments in three fenced test plots. The facility is used primarily in the spring, summer, and fall, and occasionally in winter.

The heat-generating laboratory is located on the cooler north side of the building to reduce overheating. Extensive glazing, incorporating perforated steel sliding screen panels for solar shading, lines the south façade, where the main seminar space is located. With no furnace or air conditioning, a super-insulated building shell and an insulated foundation system, patented by GO Logic, will keep heating costs to $200 to $300 annually, 10 times less than a standard code-compliant building of the same size and layout. The façade is cedar, with a steel roof. Future plans include installation of a partial green roof to provide further interior cooling in the summer.

The facility has been awarded Passive House certification by the Passivhaus Institut in Darmstadt, Germany. Unlike LEED certification, which considers a variety of factors—including location, water efficiency, and use of reclaimed materials—Passive House certification focuses exclusively on energy savings.

Project Data
Project Type: 
New Construction
Completion Date: 
July, 2014
Location: 
Three Oaks, MI
Delivery Method: 
Design/Build
Project GSF: 
2,450
Project NSF: 
2,100
Project Cost: 
$1,060,000USD
Construction Cost: 
$910,000USD
Building Descriptors: 
Ecology
Higher Education
Education: Classroom
Education: Lecture Or Seminar Hall
Environmental Science
Laboratory
Laboratory: Wet
Plant Growth Chambers
Research
Organizations
GO Logic, LLC
Architect
GO Logic, LLC
Builder
Energy Wise Homes
Site Supervision
Ebels Construction
Carpentry
Albert Putnam Associates
Structural Engineer
J.H. McPartland and Sons
Mechanical Engineer
Mitsubishi
Heating and Cooling
Zehnder ERV
Ventilation
Kneer-Sudfenster
Windows and Doors
Thermo Fisher Scientific
Lab Equipment