Tradeline, Inc. filters and categorizes new-construction and industry news from regional and professional journals across the country. Here you will find new projects, products, and regulatory updates.
Industry News
Grossmont Community College Science Facility Nears Completion
Construction is nearly complete for Grossmont Community College's new $19.7-million, 37,834-square-foot science building in El Cajon, Calif. The two-story facility will house laboratories for biology, chemistry, geology, and oceanography programs. The building will also accommodate faculty offices, a 40-station computer learning center, a greenhouse, and a walled native garden area. The facility completes the science and technology quadrangle, a square of four buildings on the campus that abuts a large open space.
Santiago Canyon College Opens Sustainably Designed Library
Santiago Canyon College celebrated the grand opening of its 39,900-sf library in Orange, Calif., on September 27, 2006. Designed by LPA Architects of Irvine, Calif., the project features a two-story environmentally–friendly design with space to accommodate 100,000 books. The $15-million facility houses 13 group study rooms, a bibliographic instruction lab, a faculty resource center, audio-visual and information technology support services, and over 75 computer workstations.
University of Wisconsin Dedicates Veterinary Diagnostic Laboratory
The University of Wisconsin-Madison School of Veterinary Medicine dedicated the 78,000-sf Wisconsin Veterinary Diagnostic Laboratory on Oct. 2, 2006. The facility will test for animal diseases including chronic wasting disease, mad cow disease, and avian influenza. The building, which reached completion in September 2006 after two years of construction, includes a self-contained 1,200-sf BSL-3 facility, an electron microscope installed on a floating floor, and a 4,000 pound capacity tissue digester.
University of Alaska Breaks Ground on Integrated Science Building
The University of Alaska, Anchorage broke ground on the 120,000-sf Integrated Science Building on Sept. 22, 2006. Slated for completion in fall of 2009, the three-story building will house offices, lecture halls, and laboratory space for the departments of physics, chemistry, biology, astronomy, geology, and biochemistry. The $87-million cost of the facility includes construction, furniture, and some equipment. Designed for flexibility, the building will encourage interaction among faculty and students engaged in undergraduate research.
DePaul University Builds Science II
DePaul University will begin construction on a second science facility at its Chicago campus on July 1, 2007. The $37.2 million Science II is slated for completion in November of 2008 with occupancy in winter quarter of 2009. The 130,000-sf, four-story facility will include a mechanical penthouse and a rooftop greenhouse. The project team is comprised of Antunovich Associates of Chicago as lead design architect and Earl Walls Associates of San Diego.